cryder

1,010 media by topicpage 1 of 11
CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center in Florida, workers prepare to begin removing the quick disconnect from the ground umbilical carrier plate (GUCP) on space shuttle Discovery's external fuel tank. A hydrogen gas leak at that location during tanking for the STS-133 mission to the International Space Station caused the launch attempt to be scrubbed Nov. 5. The GUCP will be examined to determine the cause of the hydrogen leak and then repaired. The GUCP is the overboard vent to the pad and the flame stack where the vented hydrogen is burned off. Discovery's next launch attempt is targeted for no earlier than Nov. 30 at 4:02 a.m. EST.        For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Troy Cryder KSC-2010-5569

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center in Florida, workers prepare to begin removing the quick disconnect from the ground umbilical carrier plate (GUCP) on space shuttle Discov... More

KENNEDY SPACE CENTER, FLA. -  Sitting on top of the mobile launcher platform, Space Shuttle Atlantis is on its slow rollout to Launch Pad 39B.  First motion out of the Vehicle Assembly Building was 1:05 a.m. The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1705

KENNEDY SPACE CENTER, FLA. - Sitting on top of the mobile launcher pl...

KENNEDY SPACE CENTER, FLA. - Sitting on top of the mobile launcher platform, Space Shuttle Atlantis is on its slow rollout to Launch Pad 39B. First motion out of the Vehicle Assembly Building was 1:05 a.m. Th... More

KENNEDY SPACE CENTER, FLA. -   Sitting on top of the mobile launcher platform, Space Shuttle Atlantis rolls out to Launch Pad 39B via the crawlerway.  First motion out of the Vehicle Assembly Building was 1:05 a.m.  The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1706

KENNEDY SPACE CENTER, FLA. - Sitting on top of the mobile launcher p...

KENNEDY SPACE CENTER, FLA. - Sitting on top of the mobile launcher platform, Space Shuttle Atlantis rolls out to Launch Pad 39B via the crawlerway. First motion out of the Vehicle Assembly Building was 1:05 ... More

KENNEDY SPACE CENTER, FLA. --    Tugboats tow the Pegasus barge, with its cargo of external tank No. 125, on the Banana River.  Seen in the background are the Atlas V (left) and Titan IV launch complexes.  After it is offloaded, the tank will be moved to the Vehicle Assembly Building. The external tank will be used on space shuttle Atlantis for mission STS-122 targeted for launch on Dec. 6.  Photo credit: NASA/Troy Cryder KSC-07pd2456

KENNEDY SPACE CENTER, FLA. -- Tugboats tow the Pegasus barge, with ...

KENNEDY SPACE CENTER, FLA. -- Tugboats tow the Pegasus barge, with its cargo of external tank No. 125, on the Banana River. Seen in the background are the Atlas V (left) and Titan IV launch complexes. Afte... More

KENNEDY SPACE CENTER, FLA. -    The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS) still illuminate the orbiter on Launch Pad 39B. Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but  a 24-hour scrub was called by mission managers due to a concern with Fuel Cell 1.  Seen poised above the orange external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Extending from the FSS to Atlantis is the orbiter access arm with the White Room at the end.  The White Room provides entry into the orbiter through the hatch.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Troy Cryder KSC-06pd2050

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space ...

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS) still illuminate the orbiter on Launch Pad 39B. Atlantis was originally s... More

CAPE CANAVERAL, Fla. -- On a cloudy and overcast day on Launch Pad 39A at NASA's Kennedy Space Center in Florida, workers monitor the progress of the rotating service structure (RSS) as it rolls away from space shuttle Atlantis. The RSS provides weather protection and access to the shuttle while it awaits liftoff. RSS "rollback" marks a major milestone in Atlantis' STS-135 mission countdown.      Atlantis and its crew of four; Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandy Magnus and Rex Walheim, are scheduled to lift off at 11:26 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Troy Cryder KSC-2011-5131

CAPE CANAVERAL, Fla. -- On a cloudy and overcast day on Launch Pad 39A...

CAPE CANAVERAL, Fla. -- On a cloudy and overcast day on Launch Pad 39A at NASA's Kennedy Space Center in Florida, workers monitor the progress of the rotating service structure (RSS) as it rolls away from space... More

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure has been retracted from space shuttle Atlantis as the countdown progresses toward launch on Nov. 16 at 2:28 p.m. EST of the STS-129 mission.  The movable structure, which provides weather protection and access for technicians to work on the shuttle, began being retracted at 5:20 p.m. EST and was in the park position by 5:56 p.m.     STS-129 crew members are Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On the STS-129 mission to the International Space Station, the crew will deliver two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Troy Cryder KSC-2009-6299

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure has been retracted from space shuttle Atlantis as the countdown progresses toward launch on Nov... More

CAPE CANAVERAL, Fla. –  In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Mission Specialist Shane Kimbrough gets help with his suit before entering space shuttle Endeavour. He and other crew members will take part in a simulated launch countdown.  The crew is at Kennedy to take part in the Terminal Countdown Demonstration Test, which includes equipment familiarization, emergency exit training and the simulated countdown. On the STS-126 mission, space shuttle Endeavour's crew will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station’s Solar Alpha Rotary Joints. Endeavour is targeted to launch Nov. 14. Photo credit: NASA/Troy Cryder KSC-08pd3433

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's ...

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Mission Specialist Shane Kimbrough gets help with his suit before entering space shuttle Endeavour.... More

KENNEDY SPACE CENTER, FLA. --  Inside the Space Station Processing Facility, an overhead crane moves towards the SPACEHAB Module to transport in to the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station. STS-116 will be mission number 20 to the station and construction flight 12A.1. Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7.  Photo credit: NASA/Troy Cryder KSC-06pd2444

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Fac...

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, an overhead crane moves towards the SPACEHAB Module to transport in to the Payload Canister. The SPACEHAB Module will carry racks of ... More

KENNEDY SPACE CENTER, FLA. -   After its overnight rollout from the Vehicle Assembly Building, Space Shuttle Atlantis rests on the hard stand on Launch Pad 39B.   The shuttle sits on top of the mobile launcher platform.  The crawler, which transported it, is still underneath.  To the left is the rotating service structure, with the payload changeout room (PCR) open.  When the shuttle's payload is transported to the pad, it will be lifted into the PCR, the service structure will rotate to enclose the shuttle and the payload will be installed in Atlantis' payload bay.  The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1713

KENNEDY SPACE CENTER, FLA. - After its overnight rollout from the Ve...

KENNEDY SPACE CENTER, FLA. - After its overnight rollout from the Vehicle Assembly Building, Space Shuttle Atlantis rests on the hard stand on Launch Pad 39B. The shuttle sits on top of the mobile launcher ... More

CAPE CANAVERAL, Fla. –  In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Pilot Eric Boe waits to finish his suit-up. He and other crew members will take part in a simulated launch countdown after entering space shuttle Endeavour. The crew is at Kennedy to take part in the Terminal Countdown Demonstration Test, which includes equipment familiarization, emergency exit training and the simulated countdown.  On the STS-126 mission, space shuttle Endeavour's crew will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station’s Solar Alpha Rotary Joints. Endeavour is targeted to launch Nov. 14. Photo credit: NASA/Troy Cryder KSC-08pd3430

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's ...

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Pilot Eric Boe waits to finish his suit-up. He and other crew members will take part in a simulated... More

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the tip-top of the bright-orange external fuel tank is where workers will prepare to begin removing the quick disconnect from the ground umbilical carrier plate (GUCP). A hydrogen gas leak at that location during tanking for space shuttle Discovery's STS-133 mission to the International Space Station caused the launch attempt to be scrubbed Nov. 5. The GUCP will be examined to determine the cause of the hydrogen leak and then repaired. The GUCP is the overboard vent to the pad and the flame stack where the vented hydrogen is burned off. Discovery's next launch attempt is targeted for no earlier than Nov. 30 at 4:02 a.m. EST.        For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Troy Cryder KSC-2010-5563

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the tip-top of the bright-orange external fuel tank is where workers will prepare to begin removing the quick disconnect from... More

KENNEDY SPACE CENTER, FLA. --  In the transfer aisle of the Vehicle Assembly Building, external tank No. 125 is raised off its transporter.  The tank will be raised to a vertical position and then lifted into a checkout cell in high bay 4 to allow for processing. The tank will be part of the space shuttle stack for mission STS-122 targeted to launch Dec. 6.  Photo credit: NASA/Troy Cryder KSC-07pd2473

KENNEDY SPACE CENTER, FLA. -- In the transfer aisle of the Vehicle As...

KENNEDY SPACE CENTER, FLA. -- In the transfer aisle of the Vehicle Assembly Building, external tank No. 125 is raised off its transporter. The tank will be raised to a vertical position and then lifted into a... More

KENNEDY SPACE CENTER, FLA. --  External tank No. 125 is moved out of the Pegasus barge at the Launch Complex 39 Area turn basin.  After offloading, the tank will be transported to the Vehicle Assembly Building. The tank arrived at Kennedy on the Pegasus barge from the Michoud Assembly Facility near New Orleans.  The external tank will be used on space shuttle Atlantis for mission STS-122 targeted for launch on Dec. 6.  Photo credit: NASA/Troy Cryder KSC-07pd2465

KENNEDY SPACE CENTER, FLA. -- External tank No. 125 is moved out of t...

KENNEDY SPACE CENTER, FLA. -- External tank No. 125 is moved out of the Pegasus barge at the Launch Complex 39 Area turn basin. After offloading, the tank will be transported to the Vehicle Assembly Building.... More

CAPE CANAVERAL, Fla. -- Workers unload a container holding the cruise stage, one of the first three elements for NASA's Mars Science Laboratory (MSL) that arrived at NASA Kennedy Space Center's Shuttle Landing Facility aboard an Air Force C-17 cargo plane.       The cruise stage, back shell and heat shield, the first flight elements to arrive for the MSL mission, were taken to the Payload Hazardous Servicing Facility (PHSF) located in the KSC Industrial Area to begin processing. The Curiosity rover will arrive next month.    A United Launch Alliance Atlas V-541 configuration will be used to loft MSL into space. Curiosity’s 10 science instruments are designed to search for evidence on whether Mars has had environments favorable to microbial life, including chemical ingredients for life.  The unique rover will use a laser to look inside rocks and release its gasses so that the rover’s spectrometer can analyze and send the data back to Earth. MSL is scheduled to launch from Cape Canaveral Air Force Station in Florida Nov. 25 with a window extending to Dec. 18 and arrival at Mars Aug. 2012. For more information, visit http://www.nasa.gov/msl. Photo credit: NASA/Troy Cryder KSC-2011-3510

CAPE CANAVERAL, Fla. -- Workers unload a container holding the cruise ...

CAPE CANAVERAL, Fla. -- Workers unload a container holding the cruise stage, one of the first three elements for NASA's Mars Science Laboratory (MSL) that arrived at NASA Kennedy Space Center's Shuttle Landing ... More

CAPE CANAVERAL, Fla. - As the sun sets behind Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure has been moved away from space shuttle Atlantis during the T-11 hour hold in the launch countdown.  Liftoff of the STS-129 mission is set for 2:28 p.m. EST Nov. 16.  The movable structure, which provides weather protection and access for technicians to work on the shuttle, began being retracted at 5:20 p.m. EST and was in the park position by 5:56 p.m.    STS-129 crew members are Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On the STS-129 mission to the International Space Station, the crew will deliver two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Troy Cryder KSC-2009-6300

CAPE CANAVERAL, Fla. - As the sun sets behind Launch Pad 39A at NASA's...

CAPE CANAVERAL, Fla. - As the sun sets behind Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure has been moved away from space shuttle Atlantis during the T-11 hour hold i... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians roll the test equipment away from an external tank door on space shuttle Atlantis following the successful completion of a push test.    Two umbilical doors, located on the shuttle's aft fuselage, close after external tank separation following launch. The test confirms that the door's actuators are functioning properly and that signals sent from the actuators correctly indicate that the doors have closed, creating the necessary thermal barrier for reentry.  Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission.  The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight.  Launch is targeted for May 14, 2010.  Photo credit: NASA/Troy Cryder KSC-2010-1076

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kenn...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians roll the test equipment away from an external tank door on space shuttle Atla... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, a crane lifts the gaseous nitrogen tank from space shuttle Discovery's payload bay with the aid of a "fish pole" lifting fixture.  The tank is being removed during processing for the shuttle's STS-131 mission to the International Space Station.    The tanks are used for atmosphere conditioning and for moving potable water in the crew module.  The seven-member STS-131 crew will deliver a Multi-Purpose Logistics Module filled with science racks to be transferred to laboratories on the station.  Three spacewalks will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module. This will be the 33rd shuttle mission to the station. Launch is targeted for March 18, 2010.  Photo credit: NASA/Troy Cryder KSC-2009-6101

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, a crane lifts the gaseous nitrogen tank from space shuttle Discovery's payload bay with the aid of a "fish ... More

CAPE CANAVERAL, Fla. –   In the Vehicle Assembly Building's high bay 3 at NASA's Kennedy Space Center in Florida, framework is lifted to the 16th floor for modifications related to the Ares I-X. The refurbishment of the facility is for the Constellation Program's Ares vehicles.  The Ares I and Ares V rockets will be 325 feet and 360 feet tall, respectively, considerably taller than the space shuttle atop its mobile launcher platform.    Photo credit: NASA/Troy Cryder KSC-2009-1397

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building's high bay 3...

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building's high bay 3 at NASA's Kennedy Space Center in Florida, framework is lifted to the 16th floor for modifications related to the Ares I-X. The refurbishme... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the STS-133 payload canister is lifted into the rotating service structure on Launch Pad 39A.      The payload then will be moved into space shuttle Discovery's payload bay. Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for 4:40 p.m. EDT, Nov. 1. Photo credit: NASA/Troy Cryder KSC-2010-5019

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the STS-133 payload canister is lifted into the rotating service structure on Launch Pad 39A. The payload then will be moved into space sh... More

CAPE CANAVERAL, Fla. - STS-129 Commander Charles O. Hobaugh, left, is welcomed by Space Shuttle Launch Director Mike Leinbach at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. The six astronauts for space shuttle Atlantis’ STS-129 mission have arrived at Kennedy for their launch dress rehearsal, the Terminal Countdown Demonstration Test.    Additional training associated with the test was done last month, but the simulated countdown was postponed because of a scheduling conflict with the launch of NASA’s Ares I-X test rocket.  Launch of Atlantis on its STS-129 mission to the International Space Station is set for Nov. 16. On STS-129, the crew will deliver to the station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  For information on the STS-129 mission objectives and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Troy Cryder KSC-2009-6035

CAPE CANAVERAL, Fla. - STS-129 Commander Charles O. Hobaugh, left, is ...

CAPE CANAVERAL, Fla. - STS-129 Commander Charles O. Hobaugh, left, is welcomed by Space Shuttle Launch Director Mike Leinbach at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. The six a... More

CAPE CANAVERAL, Fla. -  At NASA's Kennedy Space Center in Florida, space shuttle Endeavour rolls up the ramp toward Launch Pad 39A.  At right are the open rotating service structure and the fixed service structure with the 80-foot-tall lightning mast on top.  The shuttle moved off Launch Pad 39B starting at 8:28 am. EDT and completed its move to Launch Pad 39A at 4:37 p.m. Endeavour is targeted to launch Nov. 14 on the STS-126 mission. On this 27th mission to the International Space Station, Endeavour will carry the Lightweight Multi-Purpose Experiment Support Structure Carrier and the Multi-Purpose Logistics Module Leonardo that will hold supplies and equipment, including additional crew quarters, additional exercise equipment, spare hardware and equipment for the regenerative life support system.  Photo credit: NASA/Troy Cryder KSC-08pd3356

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, space shuttle Endeavour rolls up the ramp toward Launch Pad 39A. At right are the open rotating service structure and the fixed service struct... More

CAPE CANAVERAL, Fla. – NASA's Pegasus barge moves through the bridge at Port Canaveral, Fla.  The barge contains the external fuel tank designated ET-133 that will be used for space shuttle Atlantis' STS-129 mission.  The barge is delivering the external tank to the Turn Basin dock at NASA's Kennedy Space Center in Florida where it will be offloaded and moved into the Vehicle Assembly Building.  The tank was shipped aboard the Pegasus from NASA's Michould Assembly Facility near New Orleans. Pegasus was towed to Port Canaveral by the Freedom Star Retrieval Ship.  Photo credit: NASA/Troy Cryder KSC-2009-4388

CAPE CANAVERAL, Fla. – NASA's Pegasus barge moves through the bridge a...

CAPE CANAVERAL, Fla. – NASA's Pegasus barge moves through the bridge at Port Canaveral, Fla. The barge contains the external fuel tank designated ET-133 that will be used for space shuttle Atlantis' STS-129 mi... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, preparations are under way to install the chin panel on space shuttle Atlantis.    The chin panel is a semicircular-shaped section of reinforced carbon-carbon that fits under the shuttle's nose cap and is part of its thermal protection system.  Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight.  Launch is targeted for May 14, 2010.    Photo credit: NASA/Troy Cryder KSC-2010-1243

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kenn...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, preparations are under way to install the chin panel on space shuttle Atlantis. The chin panel is a semicirc... More

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, technicians check the sensors on the Soft Capture Mechanism (SCM), part of the Soft Capture and Rendezvous System, or SCRS, after mating of the SCM to the Flight Support System, or FSS, carrier. The SCRS will enable the future rendezvous, capture and safe disposal of NASA's Hubble Space Telescope by either a crewed or robotic mission. The ring-like device attaches to Hubble’s aft bulkhead. The SCRS greatly increases the current shuttle capture interfaces on Hubble, therefore significantly reducing the rendezvous and capture design complexities associated with the disposal mission.  The FSS will join the Multi-Use Lightweight Equipment, or MULE, carrier, the Super Lightweight Interchangeable Carrier and the Orbital Replacement Unit Carrier as payload on space shuttle Atlantis's STS-125 mission. The payload is scheduled to go to Launch Pad 39A in mid-September to be installed into Atlantis' payload bay. Atlantis is targeted to launch Oct. 8 at 1:34 a.m. EDT. Photo credit: NASA/Troy Cryder KSC-08pd2445

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at ...

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, technicians check the sensors on the Soft Capture Mechanism (SCM), part of the Soft Capture and Rendezvous Syst... More

CAPE CANAVERAL, Fla. -- STS-135 Pilot Doug Hurley prepares to perform touch-and-go landings aboard one of two Shuttle Training Aircrafts (STA) on the Shuttle Landing Facility runway at NASA's Kennedy Space Center in Florida.        An STA is a Gulfstream II jet that is modified to mimic the shuttle's handling during the final phase of landing. Ferguson and Hurley will practice landings as part of standard training before space shuttle Atlantis' launch to the International Space Station. Atlantis and its crew are targeted to lift off July 8, to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Troy Cryder KSC-2011-4658

CAPE CANAVERAL, Fla. -- STS-135 Pilot Doug Hurley prepares to perform ...

CAPE CANAVERAL, Fla. -- STS-135 Pilot Doug Hurley prepares to perform touch-and-go landings aboard one of two Shuttle Training Aircrafts (STA) on the Shuttle Landing Facility runway at NASA's Kennedy Space Cent... More

CAPE CANAVERAL, Fla. --  Towed on its 76-wheeled orbiter transporter, space shuttle Discovery rolls into the transfer aisle of the Vehicle Assembly Building at NASA's Kennedy Space Center.  Discovery will be raised to vertical and lifted into high bay 3 for attachment to its external fuel tank and solid rocket boosters in preparation for its upcoming STS-124 mission to the International Space Station.  On the mission, the STS-124 crew will transport the Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System to the space station.  Launch of Discovery is targeted for May 31. Photo credit: NASA/Troy Cryder KSC-08pd1029

CAPE CANAVERAL, Fla. -- Towed on its 76-wheeled orbiter transporter, ...

CAPE CANAVERAL, Fla. -- Towed on its 76-wheeled orbiter transporter, space shuttle Discovery rolls into the transfer aisle of the Vehicle Assembly Building at NASA's Kennedy Space Center. Discovery will be ra... More

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center in Florida, workers begin to install a new ground umbilical carrier plate (GUCP) on space shuttle Discovery's external fuel tank. A hydrogen gas leak at that location during tanking for Discovery's STS-133 mission to the International Space Station caused the launch attempt to be scrubbed Nov. 5. The GUCP is the overboard vent to the pad and the flame stack where the excess hydrogen is burned off.         For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Troy Cryder KSC-2010-5666

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center in Florida, workers begin to install a new ground umbilical carrier plate (GUCP) on space shuttle Discovery's external fuel tank. A hydro... More

CAPE CANAVERAL, Fla. –  In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Soft Capture Mechanism (SCM), part of the Soft Capture and Rendezvous System, or SCRS,  is being prepared for transfer to the Flight Support System, or FSS, carrier. The SCRS will enable the future rendezvous, capture and safe disposal of NASA's Hubble Space Telescope by either a crewed or robotic mission. The ring-like device attaches to Hubble’s aft bulkhead. The SCRS greatly increases the current shuttle capture interfaces on Hubble, therefore significantly reducing the rendezvous and capture design complexities associated with the disposal mission.  The FSS will join the Multi-Use Lightweight Equipment, or MULE, carrier, the Super Lightweight Interchangeable Carrier and the Orbital Replacement Unit Carrier as payload on space shuttle Atlantis's STS-125 mission. The payload is scheduled to go to Launch Pad 39A in mid-September to be installed into Atlantis' payload bay. Atlantis is targeted to launch Oct. 8 at 1:34 a.m. EDT. Photo credit: NASA/Troy Cryder KSC-08pd2432

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at...

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Soft Capture Mechanism (SCM), part of the Soft Capture and Rendezvous System, or SCRS, is being prepared ... More

KENNEDY SPACE CENTER, FLA. --  Under a feather-painted sky, Space Shuttle Atlantis, mounted on a mobile launch platform atop a crawler transporter, creeps up the ramp to Launch Pad 39A.  This is the second rollout for the shuttle.  First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Troy Cryder KSC-07pd1196

KENNEDY SPACE CENTER, FLA. -- Under a feather-painted sky, Space Shut...

KENNEDY SPACE CENTER, FLA. -- Under a feather-painted sky, Space Shuttle Atlantis, mounted on a mobile launch platform atop a crawler transporter, creeps up the ramp to Launch Pad 39A. This is the second roll... More

CAPE CANAVERAL, Fla. -- Space shuttle Discovery looms against the pre-dawn, cloud-streaked sky as it makes the slow 3.4-mile journey to Launch Pad 39A.  The shuttle sits atop the mobile launcher platform, which are being moved by the massive crawler-transporter beneath.  First motion out of the Vehicle Assembly Building was at 5:17 a.m. EST. Discovery is targeted to launch to the International Space Station Feb. 12. During Discovery's 14-day mission, the crew will install the S6 truss segment and its solar arrays to the starboard side of the station, completing the station's backbone, or truss, enabling a six-person crew to live there starting in May.  Photo credit: NASA/Troy Cryder KSC-2009-1119

CAPE CANAVERAL, Fla. -- Space shuttle Discovery looms against the pre-...

CAPE CANAVERAL, Fla. -- Space shuttle Discovery looms against the pre-dawn, cloud-streaked sky as it makes the slow 3.4-mile journey to Launch Pad 39A. The shuttle sits atop the mobile launcher platform, which... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, technicians prepare a working model of the dexterous humanoid astronaut helper, Robonaut 2, for the media to check out before space shuttle Discovery's final flight on the STS-133 mission.          Discovery and its six-member crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2 to the International Space Station. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo Credit: NASA/Troy Cryder KSC-2011-1646

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, tec...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, technicians prepare a working model of the dexterous humanoid astronaut helper, Robonaut 2, for the media to check out before space shuttle Dis... More

CAPE CANAVERAL, Fla. -- On a cloudy and overcast day on Launch Pad 39A at NASA's Kennedy Space Center in Florida, workers prepare to roll the rotating service structure (RSS) away from space shuttle Atlantis. The RSS provides weather protection and access to the shuttle while it awaits liftoff. RSS "rollback" marks a major milestone in Atlantis' STS-135 mission countdown.          Atlantis and its crew of four; Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandy Magnus and Rex Walheim, are scheduled to lift off at 11:26 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Troy Cryder KSC-2011-5122

CAPE CANAVERAL, Fla. -- On a cloudy and overcast day on Launch Pad 39A...

CAPE CANAVERAL, Fla. -- On a cloudy and overcast day on Launch Pad 39A at NASA's Kennedy Space Center in Florida, workers prepare to roll the rotating service structure (RSS) away from space shuttle Atlantis. T... More

CAPE CANAVERAL, Fla. -- Employees check out space shuttle Atlantis after it was uncovered on Launch Pad 39A at NASA's Kennedy Space Center in Florida following the move of the rotating service structure (RSS). The structure provides weather protection and access to the shuttle while it awaits liftoff on the pad. RSS "rollback" marks a major milestone in Atlantis' STS-135 mission countdown.        Atlantis and its crew of four; Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandy Magnus and Rex Walheim, are scheduled to lift off at 11:26 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Troy Cryder KSC-2011-5147

CAPE CANAVERAL, Fla. -- Employees check out space shuttle Atlantis aft...

CAPE CANAVERAL, Fla. -- Employees check out space shuttle Atlantis after it was uncovered on Launch Pad 39A at NASA's Kennedy Space Center in Florida following the move of the rotating service structure (RSS). ... More

CAPE CANAVERAL, Fla. – NASA's Pegasus barge moves through the bridge at Port Canaveral, Fla.  The barge contains the external fuel tank designated ET-133 that will be used for space shuttle Atlantis' STS-129 mission.  The barge is delivering the external tank to the Turn Basin dock at NASA's Kennedy Space Center in Florida where it will be offloaded and moved into the Vehicle Assembly Building.  The tank was shipped aboard the Pegasus from NASA's Michould Assembly Facility near New Orleans. Pegasus was towed to Port Canaveral by the Freedom Star Retrieval Ship.  Photo credit: NASA/Troy Cryder KSC-2009-4387

CAPE CANAVERAL, Fla. – NASA's Pegasus barge moves through the bridge a...

CAPE CANAVERAL, Fla. – NASA's Pegasus barge moves through the bridge at Port Canaveral, Fla. The barge contains the external fuel tank designated ET-133 that will be used for space shuttle Atlantis' STS-129 mi... More

CAPE CANAVERAL, Fla. –At NASA's Kennedy Space Center in Florida, the crawler-transporter delivers space shuttle Discovery atop the mobile launcher platform onto Launch Pad 39A.  Traveling from the Vehicle Assembly Building, the shuttle took nearly 12 hours on the journey as technicians stopped several times to clear mud from the crawler's treads and bearings caused by the waterlogged crawlerway.  First motion out of the VAB was at 2:07 a.m. EDT Aug. 4. Rollout was delayed approximately 2 hours due to lightning in the area.  In the background is the blue water of the Atlantic Ocean.  At left is the White Room at the end of the orbiter access arm.  When in place against shuttle, the White Room provides entry into the cockpit.  Discovery's 13-day flight will deliver a new crew member and 33,000 pounds of equipment to the International Space Station. The equipment includes science and storage racks, a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Launch of Discovery on its STS-128 mission is targeted for late August.   Photo credit: NASA/Troy Cryder KSC-2009-4423

CAPE CANAVERAL, Fla. –At NASA's Kennedy Space Center in Florida, the c...

CAPE CANAVERAL, Fla. –At NASA's Kennedy Space Center in Florida, the crawler-transporter delivers space shuttle Discovery atop the mobile launcher platform onto Launch Pad 39A. Traveling from the Vehicle Assem... More

CAPE CANAVERAL, Fla. -  Space shuttle Endeavour on Launch Pad 39B is viewed from the air after the rollout from the Vehicle Assembly Building at NASA's Kennedy Space Center.  The shuttle and mobile launcher platform it sits on are atop the crawler-transporter. At left of the shuttle is the open rotating service structure with the payload changeout room revealed. First motion out of the Vehicle Assembly Building was at 11:15 p.m. Sept. 18.  Endeavour completed the 4.2-mile journey at 6:59 a.m. EDT. For the first time since July 2001, two shuttles are on the launch pads at the same time at the center. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to repair NASA's Hubble Space Telescope, targeted to launch Oct. 10. After Endeavour is cleared from its duty as a rescue spacecraft, it will be moved to Launch Pad 39A for the STS-126 mission to the International Space Station. That flight is targeted for launch Nov. 12. Photo credit: NASA/Troy Cryder KSC-08pd2682

CAPE CANAVERAL, Fla. - Space shuttle Endeavour on Launch Pad 39B is v...

CAPE CANAVERAL, Fla. - Space shuttle Endeavour on Launch Pad 39B is viewed from the air after the rollout from the Vehicle Assembly Building at NASA's Kennedy Space Center. The shuttle and mobile launcher pla... More

KENNEDY SPACE CENTER, FLA.  - In high bay 3 of the Vehicle Assembly Building, the orbiter Atlantis has been lowered onto the mobile launcher platform below for mating with the external tank and solid rocket boosters already in place.  After the stacking, Atlantis will undergo a shuttle interface test and other prelaunch processing.  Atlantis' launch window begins Aug. 28. During its 11-day mission to the International Space Station, the STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.  Photo credit: NASA/Troy Cryder KSC-06pd1667

KENNEDY SPACE CENTER, FLA. - In high bay 3 of the Vehicle Assembly Bu...

KENNEDY SPACE CENTER, FLA. - In high bay 3 of the Vehicle Assembly Building, the orbiter Atlantis has been lowered onto the mobile launcher platform below for mating with the external tank and solid rocket boo... More

CAPE CANAVERAL, Fla. -  In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the Multi-Purpose Logistics Module Leonardo is lowered into the payload canister for transfer to Launch Pad 39A.  Leonardo is part of space shuttle Endeavour's payload on the STS-126 mission to the International Space Station. At the pad, the payload canister will release its cargo into the Payload Changeout Room.  Later, the payload will be installed in space shuttle Endeavour's payload bay.  The module contains supplies and equipment, including additional crew quarters, equipment for the regenerative life support system and spare hardware. Endeavour is targeted for launch on Nov. 14.  Photo credit: NASA/Troy Cryder KSC-08pd3298

CAPE CANAVERAL, Fla. - In the Space Station Processing Facility at NA...

CAPE CANAVERAL, Fla. - In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the Multi-Purpose Logistics Module Leonardo is lowered into the payload canister for transfer to Launc... More

KENNEDY SPACE CENTER, FLA. --  Viewed from behind inside the Vehicle Assembly Building, space shuttle Discovery is lifted into the upper regions for transfer to high bay 1.  In the bay, Discovery will be mated with the external tank and solid rocket boosters waiting on the mobile launcher platform. Discovery is targeted for launch to the International Space Station for mission STS-120 on Oct. 23.  The crew will be delivering and installing the Italian-built U.S. Node 2, named Harmony.  The pressurized module will act as an internal connecting port and passageway to additional international science labs and cargo spacecraft. In addition to increasing the living and working space inside the station, it also will serve as a work platform outside for the station's robotic arm.  Photo credit: NASA/Troy Cryder KSC-07pd2553

KENNEDY SPACE CENTER, FLA. -- Viewed from behind inside the Vehicle A...

KENNEDY SPACE CENTER, FLA. -- Viewed from behind inside the Vehicle Assembly Building, space shuttle Discovery is lifted into the upper regions for transfer to high bay 1. In the bay, Discovery will be mated ... More

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the tip-top of the bright-orange external fuel tank is where workers will prepare to begin removing the quick disconnect from the ground umbilical carrier plate (GUCP). A hydrogen gas leak at that location during tanking for space shuttle Discovery's STS-133 mission to the International Space Station caused the launch attempt to be scrubbed Nov. 5. The GUCP will be examined to determine the cause of the hydrogen leak and then repaired. The GUCP is the overboard vent to the pad and the flame stack where the vented hydrogen is burned off. Discovery's next launch attempt is targeted for no earlier than Nov. 30 at 4:02 a.m. EST.        For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Troy Cryder KSC-2010-5559

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the tip-top of the bright-orange external fuel tank is where workers will prepare to begin removing the quick disconnect from... More

CAPE CANAVERAL, Fla. -- This aerial view of NASA's Kennedy Space Center shows space shuttle Discovery, secured atop a mobile launch platform as it is moved into position at Launch Pad 39A to prepare for the STS-124 mission.  The 3.4-mile journey from the Vehicle Assembly Building began at 11:47 p.m. on May 2.  The shuttle arrived at the launch pad at 4:25 a.m. EDT May 3 and was secured, or hard down, by 6:06 a.m.  On the 13-day mission, Discovery and its crew will deliver the Japan Aerospace Exploration Agency's Japanese Experiment Module – Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 31.  Photo credit: NASA/Troy Cryder KSC-08pd1105

CAPE CANAVERAL, Fla. -- This aerial view of NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. -- This aerial view of NASA's Kennedy Space Center shows space shuttle Discovery, secured atop a mobile launch platform as it is moved into position at Launch Pad 39A to prepare for the STS... More

CAPE CANAVERAL, Fla. -  At NASA's Kennedy Space Center in Florida, space shuttle Endeavour rolls off Launch Pad 39B for the 3.4-mile rollaround to Launch Pad 39A. First motion was at 8:28 a.m. EDT. Endeavour is targeted to launch Nov. 14 on the STS-126 mission. On this 27th mission to the International Space Station, Endeavour will carry the Lightweight Multi-Purpose Experiment Support Structure Carrier and the Multi-Purpose Logistics Module Leonardo that will hold supplies and equipment, including additional crew quarters, additional exercise equipment, spare hardware and equipment for the regenerative life support system.  Photo credit: NASA/Troy Cryder KSC-08pd3355

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, space shuttle Endeavour rolls off Launch Pad 39B for the 3.4-mile rollaround to Launch Pad 39A. First motion was at 8:28 a.m. EDT. Endeavour is... More

CAPE CANAVERAL, Fla. -  An aerial view south along the seashore shows shuttles on both launch pads. The Atlantic Ocean is a thin line on the horizon.  At left is space shuttle Atlantis, preparing for its launch on the STS-125 mission to repair NASA's Hubble Space Telescope, targeted for Oct. 10. At right is space shuttle Endeavour, which rolled out Sept. 19, completing the 4.2-mile journey at 6:59 a.m. EDT. This is the first time since July 2001 that two shuttles are on the launch pads at the same time at the center. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission. After Endeavour is cleared from its duty as a rescue spacecraft, it will be moved to Launch Pad 39A for the STS-126 mission to the International Space Station. That flight is targeted for launch Nov. 12.  Photo credit: NASA/Troy Cryder KSC-08pd2694

CAPE CANAVERAL, Fla. - An aerial view south along the seashore shows ...

CAPE CANAVERAL, Fla. - An aerial view south along the seashore shows shuttles on both launch pads. The Atlantic Ocean is a thin line on the horizon. At left is space shuttle Atlantis, preparing for its launch... More

KENNEDY SPACE CENTER, FLA.  -  At NASA Kennedy Space Center's Shuttle Landing Facility, volunteer Charlie Plain poses as an injured astronaut during a simulated emergency landing of a shuttle crew.  Plain is a Public Affairs Web writer.   Known as a Mode VI exercise, the operation uses volunteer workers from the Center to pose as astronauts. The purpose of the simulation is to exercise emergency preparedness personnel, equipment and facilities in rescuing astronauts from a downed orbiter and providing immediate medical attention. Photo credit: NASA/Troy Cryder KSC-06pd0519

KENNEDY SPACE CENTER, FLA. - At NASA Kennedy Space Center's Shuttle ...

KENNEDY SPACE CENTER, FLA. - At NASA Kennedy Space Center's Shuttle Landing Facility, volunteer Charlie Plain poses as an injured astronaut during a simulated emergency landing of a shuttle crew. Plain is a ... More

KENNEDY SPACE CENTER, FLA.  -  At NASA Kennedy Space Center's Shuttle Landing Facility, an emergency rescue worker tends to an "injured astronaut" inside a rescue vehicle.  Volunteers and emergency rescue workers are participating in a simulated emergency landing of a shuttle crew.   Known as a Mode VI exercise, the operation uses volunteer workers from the Center to pose as astronauts. The purpose of the simulation is to exercise emergency preparedness personnel, equipment and facilities in rescuing astronauts from a downed orbiter and providing immediate medical attention. Photo credit: NASA/Troy Cryder KSC-06pd0517

KENNEDY SPACE CENTER, FLA. - At NASA Kennedy Space Center's Shuttle ...

KENNEDY SPACE CENTER, FLA. - At NASA Kennedy Space Center's Shuttle Landing Facility, an emergency rescue worker tends to an "injured astronaut" inside a rescue vehicle. Volunteers and emergency rescue worke... More

KENNEDY SPACE CENTER, FLA.  -  At NASA Kennedy Space Center's Shuttle Landing Facility, emergency rescue personnel gently place an "injured astronaut" onto a stretcher.  Volunteers and emergency rescue workers are participating in a simulated emergency landing of a shuttle crew. Known as a Mode VI exercise, the operation uses volunteer workers from the Center to pose as astronauts. The purpose of the simulation is to exercise emergency preparedness personnel, equipment and facilities in rescuing astronauts from a downed orbiter and providing immediate medical attention. Photo credit: NASA/Troy Cryder KSC-06pd0516

KENNEDY SPACE CENTER, FLA. - At NASA Kennedy Space Center's Shuttle ...

KENNEDY SPACE CENTER, FLA. - At NASA Kennedy Space Center's Shuttle Landing Facility, emergency rescue personnel gently place an "injured astronaut" onto a stretcher. Volunteers and emergency rescue workers ... More

KENNEDY SPACE CENTER, FLA.  -  At NASA Kennedy Space Center's Shuttle Landing Facility, emergency rescue worker tend to "injured astronauts" during a simulated emergency landing of a shuttle crew.   Known as a Mode VI exercise, the operation uses volunteer workers from the Center to pose as astronauts. The purpose of the simulation is to exercise emergency preparedness personnel, equipment and facilities in rescuing astronauts from a downed orbiter and providing immediate medical attention. Photo credit: NASA/Troy Cryder KSC-06pd0518

KENNEDY SPACE CENTER, FLA. - At NASA Kennedy Space Center's Shuttle ...

KENNEDY SPACE CENTER, FLA. - At NASA Kennedy Space Center's Shuttle Landing Facility, emergency rescue worker tend to "injured astronauts" during a simulated emergency landing of a shuttle crew. Known as a ... More

KENNEDY SPACE CENTER, FLA.  -   On its transporter, the spacecraft GOES-N leaves Astrotech Space Operations in Titusville, Fla., on its way to Launch Complex 37 at Cape Canaveral Air Force Station. At the pad, the spacecraft will be lifted up into the mobile service tower and mated with a Boeing Delta IV rocket for launch.  GOES-N is the latest in a series of Geostationary Operational Environmental Satellites for NOAA and NASA providing continuous monitoring necessary for intensive data analysis. GOES-N is scheduled for launch May 18.  Photo credit: NASA/Troy Cryder KSC-06pd0753

KENNEDY SPACE CENTER, FLA. - On its transporter, the spacecraft GOE...

KENNEDY SPACE CENTER, FLA. - On its transporter, the spacecraft GOES-N leaves Astrotech Space Operations in Titusville, Fla., on its way to Launch Complex 37 at Cape Canaveral Air Force Station. At the pad, ... More

KENNEDY SPACE CENTER, FLA.  -   On its transporter, the spacecraft GOES-N travels through the Launch Complex 39 Area at NASA's Kennedy Space Center on its way to Launch Complex 37 at Cape Canaveral Air Force Station. At the pad, the spacecraft will be lifted up into the mobile service tower and mated with a Boeing Delta IV rocket for launch.  GOES-N is the latest in a series of Geostationary Operational Environmental Satellites for NOAA and NASA providing continuous monitoring necessary for intensive data analysis. GOES-N is scheduled for launch May 18.  Photo credit: NASA/Troy Cryder KSC-06pd0754

KENNEDY SPACE CENTER, FLA. - On its transporter, the spacecraft GOE...

KENNEDY SPACE CENTER, FLA. - On its transporter, the spacecraft GOES-N travels through the Launch Complex 39 Area at NASA's Kennedy Space Center on its way to Launch Complex 37 at Cape Canaveral Air Force St... More

KENNEDY SPACE CENTER, FLA. --   The payload canister passes NASA's Vehicle Assembly Building and Launch Control Center on its way to Launch Pad 39B.  Inside are the payloads for mission STS-121: the multi-purpose logistics module Leonardo, with supplies and equipment for the International Space Station; the lightweight multi-purpose experiment support structure carrier; and the integrated cargo carrier, with the mobile transporter reel assembly and a spare pump module. The payload will be transferred from the canister to Space Shuttle Discovery's payload bay at the pad.  Discovery is scheduled to launch on mission STS-121 from Launch Pad 39B in a window that opens July 1 and extends to July 19. Photo credit: NASA/Troy Cryder KSC-06pd0845

KENNEDY SPACE CENTER, FLA. -- The payload canister passes NASA's Veh...

KENNEDY SPACE CENTER, FLA. -- The payload canister passes NASA's Vehicle Assembly Building and Launch Control Center on its way to Launch Pad 39B. Inside are the payloads for mission STS-121: the multi-purpo... More

KENNEDY SPACE CENTER, FLA.  -   In the Space Station Processing Facility, an overhead crane lowers the Port 3/4 truss segment toward the waiting payload canister for installation in the orbiter Atlantis. On the right end are the mast canisters for the solar arrays. The truss is slated for launch on mission STS-115 no earlier than Aug. 28. The truss is the next major addition to the 11-segment integrated truss structure that will eventually span more than 300 feet on the station. The P3/P4 truss, with its two large solar arrays, will provide one-fourth of the total power-generation capability of the completed station.  The P3/P4 truss is expected to be loaded into Atlantis's cargo bay around the beginning of August.  Photo credit: NASA/Troy Cryder KSC-06pd1634

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facili...

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, an overhead crane lowers the Port 3/4 truss segment toward the waiting payload canister for installation in the orbiter Atlantis. On the... More

KENNEDY SPACE CENTER, FLA.  -   In the Space Station Processing Facility, an overhead crane moves the Port 3/4 truss segment across the floor to the waiting payload canister for installation in the orbiter Atlantis. The truss is slated for launch on mission STS-115 no earlier than Aug. 28. The truss is the next major addition to the 11-segment integrated truss structure that will eventually span more than 300 feet on the station. The P3/P4 truss, with its two large solar arrays, will provide one-fourth of the total power-generation capability of the completed station.  The P3/P4 truss is expected to be loaded into Atlantis's cargo bay around the beginning of August.  Photo credit: NASA/Troy Cryder KSC-06pd1633

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facili...

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, an overhead crane moves the Port 3/4 truss segment across the floor to the waiting payload canister for installation in the orbiter Atla... More

KENNEDY SPACE CENTER, FLA.  -   In the Space Station Processing Facility, an overhead crane is ready to lift the Port 3/4 truss segment and move it to a payload canister for installation in the orbiter Atlantis.  The truss is slated for launch on mission STS-115 no earlier than Aug. 28. The truss is the next major addition to the 11-segment integrated truss structure that will eventually span more than 300 feet on the station. The P3/P4 truss, with its two large solar arrays, will provide one-fourth of the total power-generation capability of the completed station.  The P3/P4 truss is expected to be loaded into Atlantis's cargo bay around the beginning of August.  Photo credit: NASA/Troy Cryder KSC-06pd1632

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facili...

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, an overhead crane is ready to lift the Port 3/4 truss segment and move it to a payload canister for installation in the orbiter Atlantis... More

KENNEDY SPACE CENTER, FLA.  -    The next element to be added to the International Space Station, the Port 3/4 truss segment is being moved to a payload canister for installation in the orbiter Atlantis.  The cylinders shown are the mast canisters for the solar arrays.  The truss is slated for launch on mission STS-115 no earlier than Aug. 28. The truss is the next major addition to the 11-segment integrated truss structure that will eventually span more than 300 feet on the station. The P3/P4 truss, with its two large solar arrays, will provide one-fourth of the total power-generation capability of the completed station.  The P3/P4 truss is expected to be loaded into Atlantis's cargo bay around the beginning of August.  Photo credit: NASA/Troy Cryder KSC-06pd1631

KENNEDY SPACE CENTER, FLA. - The next element to be added to the I...

KENNEDY SPACE CENTER, FLA. - The next element to be added to the International Space Station, the Port 3/4 truss segment is being moved to a payload canister for installation in the orbiter Atlantis. The c... More

KENNEDY SPACE CENTER, FLA.  -  In the Space Station Processing Facility, an overhead crane lowers the Port 3/4 truss segment into the waiting payload canister for installation in the orbiter Atlantis.  The truss is slated for launch on mission STS-115 no earlier than Aug. 28. The truss is the next major addition to the 11-segment integrated truss structure that will eventually span more than 300 feet on the station. The P3/P4 truss, with its two large solar arrays, will provide one-fourth of the total power-generation capability of the completed station.  The P3/P4 truss is expected to be loaded into Atlantis's cargo bay around the beginning of August.  Photo credit: NASA/Troy Cryder KSC-06pd1636

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facilit...

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, an overhead crane lowers the Port 3/4 truss segment into the waiting payload canister for installation in the orbiter Atlantis. The trus... More

KENNEDY SPACE CENTER, FLA.  -    In the Space Station Processing Facility, an overhead crane lowers the Port 3/4 truss segment into the waiting payload canister for installation in the orbiter Atlantis.  The truss is slated for launch on mission STS-115 no earlier than Aug. 28. The truss is the next major addition to the 11-segment integrated truss structure that will eventually span more than 300 feet on the station. The P3/P4 truss, with its two large solar arrays, will provide one-fourth of the total power-generation capability of the completed station.  The P3/P4 truss is expected to be loaded into Atlantis's cargo bay around the beginning of August.  Photo credit: NASA/Troy Cryder KSC-06pd1635

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facil...

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, an overhead crane lowers the Port 3/4 truss segment into the waiting payload canister for installation in the orbiter Atlantis. The tr... More

KENNEDY SPACE CENTER, FLA.  - In high bay 3 of the Vehicle Assembly Building, the orbiter Atlantis has been lowered onto the mobile launcher platform below for mating with the external tank and solid rocket boosters already in place. After the stacking, Atlantis will undergo a shuttle interface test and other prelaunch processing.  Atlantis' launch window begins Aug. 28. During its 11-day mission to the International Space Station, the STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.  Photo credit: NASA/Troy Cryder KSC-06pd1666

KENNEDY SPACE CENTER, FLA. - In high bay 3 of the Vehicle Assembly Bu...

KENNEDY SPACE CENTER, FLA. - In high bay 3 of the Vehicle Assembly Building, the orbiter Atlantis has been lowered onto the mobile launcher platform below for mating with the external tank and solid rocket boo... More

KENNEDY SPACE CENTER, FLA.  - In high bay 3 of the Vehicle Assembly Building, the nose of the orbiter Atlantis is dwarfed by the external tank behind it and the twin solid rocket boosters.  The orbiter is being mated with the tank and boosters, already installed on the mobile launcher platform below.  After the stacking, Atlantis will undergo a shuttle interface test and other prelaunch processing.  Atlantis' launch window begins Aug. 28. During its 11-day mission to the International Space Station, the STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.  Photo credit: NASA/Troy Cryder KSC-06pd1665

KENNEDY SPACE CENTER, FLA. - In high bay 3 of the Vehicle Assembly Bu...

KENNEDY SPACE CENTER, FLA. - In high bay 3 of the Vehicle Assembly Building, the nose of the orbiter Atlantis is dwarfed by the external tank behind it and the twin solid rocket boosters. The orbiter is being... More

KENNEDY SPACE CENTER, FLA.  - In high bay 3 of the Vehicle Assembly Building, Atlantis' external tank and solid rocket boosters are ready on the mobile launcher platform for mating with the orbiter Atlantis, being lowered by a crane.   After the stacking, Atlantis will undergo a shuttle interface test and other prelaunch processing.  Atlantis' launch window begins Aug. 28. During its 11-day mission to the International Space Station, the STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.  Photo credit: NASA/Troy Cryder KSC-06pd1664

KENNEDY SPACE CENTER, FLA. - In high bay 3 of the Vehicle Assembly Bu...

KENNEDY SPACE CENTER, FLA. - In high bay 3 of the Vehicle Assembly Building, Atlantis' external tank and solid rocket boosters are ready on the mobile launcher platform for mating with the orbiter Atlantis, be... More

KENNEDY SPACE CENTER, FLA.  - In the Vehicle Assembly Building, Atlantis is lowered into high bay 3 for mating with the external tank and solid rocket boosters already installed on the mobile launcher platform. After the stacking, Atlantis will undergo a shuttle interface test and other prelaunch processing.  Atlantis' launch window begins Aug. 28. During its 11-day mission to the International Space Station, the STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.  Photo credit: NASA/Troy Cryder KSC-06pd1663

KENNEDY SPACE CENTER, FLA. - In the Vehicle Assembly Building, Atlant...

KENNEDY SPACE CENTER, FLA. - In the Vehicle Assembly Building, Atlantis is lowered into high bay 3 for mating with the external tank and solid rocket boosters already installed on the mobile launcher platform.... More

KENNEDY SPACE CENTER, FLA. -    Space Shuttle Atlantis sits on the hardstand of Launch Pad 39B after its nearly 8-hour rollout from the Vehicle Assembly Building. The "beanie cap," at the end of the external tank gaseous oxygen vent arm, is extended over the top of the external tank. The cap is a vent hood  that vacuums away the very cold liquid oxygen vapors as they boil off from the top of the external tank before launch.  Lower down on the left is the orbiter access arm, with the White Room on the outer end, extended toward Atlantis' crew access hatch. Below the orbiter, on each side of the main engine nozzles, are the tail service masts that provide several umbilical connections to the orbiter, including a liquid-oxygen line through one and a liquid-hydrogen line through another.  The slow speed of the crawler results in a 6- to 8-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder & George Shelton KSC-06pd1722

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis sits on the har...

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis sits on the hardstand of Launch Pad 39B after its nearly 8-hour rollout from the Vehicle Assembly Building. The "beanie cap," at the end of the external ta... More

KENNEDY SPACE CENTER, FLA. -   After its overnight rollout from the Vehicle Assembly Building, Space Shuttle Atlantis rests on the hard stand on Launch Pad 39B.   The shuttle sits on top of the mobile launcher platform.  The crawler, which transported it, is still underneath.  To the left is the rotating service structure, with the payload changeout room (PCR) open.  When the shuttle's payload is transported to the pad, it will be lifted into the PCR, the service structure will rotate to enclose the shuttle and the payload will be installed in Atlantis' payload bay.  The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1715

KENNEDY SPACE CENTER, FLA. - After its overnight rollout from the Ve...

KENNEDY SPACE CENTER, FLA. - After its overnight rollout from the Vehicle Assembly Building, Space Shuttle Atlantis rests on the hard stand on Launch Pad 39B. The shuttle sits on top of the mobile launcher ... More

KENNEDY SPACE CENTER, FLA. -   After its overnight rollout from the Vehicle Assembly Building, Space Shuttle Atlantis rests on the hard stand on Launch Pad 39B.   The shuttle sits on top of the mobile launcher platform.  The crawler, which transported it, is still underneath.  The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1714

KENNEDY SPACE CENTER, FLA. - After its overnight rollout from the Ve...

KENNEDY SPACE CENTER, FLA. - After its overnight rollout from the Vehicle Assembly Building, Space Shuttle Atlantis rests on the hard stand on Launch Pad 39B. The shuttle sits on top of the mobile launcher ... More

KENNEDY SPACE CENTER, FLA. -  Sitting on top of the mobile launcher platform, Space Shuttle Atlantis begins rolling out of the Vehicle Assembly Building to Launch Pad 39B via the crawler-transporter underneath.   First motion was at 1:05 a.m.  The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1700

KENNEDY SPACE CENTER, FLA. - Sitting on top of the mobile launcher pl...

KENNEDY SPACE CENTER, FLA. - Sitting on top of the mobile launcher platform, Space Shuttle Atlantis begins rolling out of the Vehicle Assembly Building to Launch Pad 39B via the crawler-transporter underneath.... More

KENNEDY SPACE CENTER, FLA. -   In the bright light of day, Space Shuttle Atlantis nears the hard stand on Launch Pad 39B.  First motion out of the Vehicle Assembly Building was 1:05 a.m.  The shuttle sits on top of the mobile launcher platform, which in turn rests on the crawler-transporter.  At right is the 290-foot high, 300,000- gallon water tank that aids in sound suppression during launch. The water releases just prior to the ignition of the shuttle engines and flows through 7-foot-diameter pipes for about 20 seconds, pouring into 16 nozzles atop the flame deflectors and from outlets in the main engines exhaust hole in the mobile launcher platform.  The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1710

KENNEDY SPACE CENTER, FLA. - In the bright light of day, Space Shutt...

KENNEDY SPACE CENTER, FLA. - In the bright light of day, Space Shuttle Atlantis nears the hard stand on Launch Pad 39B. First motion out of the Vehicle Assembly Building was 1:05 a.m. The shuttle sits on to... More

KENNEDY SPACE CENTER, FLA. -    The tracks of the crawler-transporter are visible on the crawlerway (foreground) leading to Launch Pad 39B after the 4-mile journey of Space Shuttle Atlantis, which sits on the pad.  At right is the 290-foot high, 300,000- gallon water tank that aids in sound suppression during launch. The water releases just prior to the ignition of the shuttle engines and flows through 7-foot-diameter pipes for about 20 seconds, pouring into 16 nozzles atop the flame deflectors and from outlets in the main engines exhaust hole in the mobile launcher platform.   The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1716

KENNEDY SPACE CENTER, FLA. - The tracks of the crawler-transporter ...

KENNEDY SPACE CENTER, FLA. - The tracks of the crawler-transporter are visible on the crawlerway (foreground) leading to Launch Pad 39B after the 4-mile journey of Space Shuttle Atlantis, which sits on the p... More

KENNEDY SPACE CENTER, FLA. -  Sitting on top of the mobile launcher platform, Space Shuttle Atlantis rolls out of the Vehicle Assembly Building to Launch Pad 39B via the crawler-transporter underneath.   First motion was at 1:05 a.m.  The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1702

KENNEDY SPACE CENTER, FLA. - Sitting on top of the mobile launcher pl...

KENNEDY SPACE CENTER, FLA. - Sitting on top of the mobile launcher platform, Space Shuttle Atlantis rolls out of the Vehicle Assembly Building to Launch Pad 39B via the crawler-transporter underneath. First ... More

KENNEDY SPACE CENTER, FLA. -  Sitting on top of the mobile launcher platform, Space Shuttle Atlantis rolls out of the Vehicle Assembly Building to Launch Pad 39B via the crawler-transporter underneath.   First motion was at 1:05 a.m.  The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1703

KENNEDY SPACE CENTER, FLA. - Sitting on top of the mobile launcher pl...

KENNEDY SPACE CENTER, FLA. - Sitting on top of the mobile launcher platform, Space Shuttle Atlantis rolls out of the Vehicle Assembly Building to Launch Pad 39B via the crawler-transporter underneath. First ... More

KENNEDY SPACE CENTER, FLA. -   Silhouetted against the rising sun, Space Shuttle Atlantis rolls toward Launch Pad 39B.  First motion out of the Vehicle Assembly Building was 1:05 a.m.  The shuttle sits on top of the mobile launcher platform, which in turn rests on the crawler-transporter.  The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1708

KENNEDY SPACE CENTER, FLA. - Silhouetted against the rising sun, Spa...

KENNEDY SPACE CENTER, FLA. - Silhouetted against the rising sun, Space Shuttle Atlantis rolls toward Launch Pad 39B. First motion out of the Vehicle Assembly Building was 1:05 a.m. The shuttle sits on top o... More

KENNEDY SPACE CENTER, FLA. -   Finally in the bright light of day, Space Shuttle Atlantis nears the hard stand on Launch Pad 39B.  First motion out of the Vehicle Assembly Building was 1:05 a.m.  The shuttle sits on top of the mobile launcher platform, which in turn rests on the crawler-transporter.  The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1709

KENNEDY SPACE CENTER, FLA. - Finally in the bright light of day, Spa...

KENNEDY SPACE CENTER, FLA. - Finally in the bright light of day, Space Shuttle Atlantis nears the hard stand on Launch Pad 39B. First motion out of the Vehicle Assembly Building was 1:05 a.m. The shuttle si... More

KENNEDY SPACE CENTER, FLA. -     This closeup of Space Shuttle Atlantis on the hardstand of Launch Pad 39B shows the surrounding area, including the Atlantic Ocean in the background.  Extended toward Atlantis is the orbiter access arm with the White Room at the end.  The room provides access into the orbiter.   Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder & George Shelton KSC-06pd1724

KENNEDY SPACE CENTER, FLA. - This closeup of Space Shuttle Atlanti...

KENNEDY SPACE CENTER, FLA. - This closeup of Space Shuttle Atlantis on the hardstand of Launch Pad 39B shows the surrounding area, including the Atlantic Ocean in the background. Extended toward Atlantis i... More

KENNEDY SPACE CENTER, FLA. -   In the early morning light, photographers maneuver for the best position to capture Space Shuttle Atlantis as it rolls toward Launch Pad 39B.  First motion out of the Vehicle Assembly Building was 1:05 a.m.  The shuttle sits on top of the mobile launcher platform, which in turn rests on the crawler-transporter.   The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1707

KENNEDY SPACE CENTER, FLA. - In the early morning light, photographe...

KENNEDY SPACE CENTER, FLA. - In the early morning light, photographers maneuver for the best position to capture Space Shuttle Atlantis as it rolls toward Launch Pad 39B. First motion out of the Vehicle Asse... More

KENNEDY SPACE CENTER, FLA. -    This closeup of Space Shuttle Atlantis on the hardstand of Launch Pad 39B shows the surrounding area, including the Atlantic Ocean in the background.  Above the orange external tank is the "beanie cap" at the end of the external tank gaseous oxygen vent arm. The cap is a vent hood  that vacuums away the very cold liquid oxygen vapors as they boil off from the top of the external tank before launch.  Lower down is the orbiter access arm, with the White Room on the outer end, extended toward Atlantis' crew access hatch.   The slow speed of the crawler results in a 6- to 8-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder & George Shelton KSC-06pd1723

KENNEDY SPACE CENTER, FLA. - This closeup of Space Shuttle Atlantis...

KENNEDY SPACE CENTER, FLA. - This closeup of Space Shuttle Atlantis on the hardstand of Launch Pad 39B shows the surrounding area, including the Atlantic Ocean in the background. Above the orange external t... More

KENNEDY SPACE CENTER, FLA. -  Sitting on top of the mobile launcher platform, Space Shuttle Atlantis begins rolling out of the Vehicle Assembly Building to Launch Pad 39B via the crawler-transporter underneath.   First motion was at 1:05 a.m.  The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1701

KENNEDY SPACE CENTER, FLA. - Sitting on top of the mobile launcher pl...

KENNEDY SPACE CENTER, FLA. - Sitting on top of the mobile launcher platform, Space Shuttle Atlantis begins rolling out of the Vehicle Assembly Building to Launch Pad 39B via the crawler-transporter underneath.... More

KENNEDY SPACE CENTER, FLA. -  Looking like fireflies gathered around the behemoth mobile launcher platform and crawler-transporter, vehicles escort Space Shuttle Atlantis on its slow journey to Launch Pad 39B.  First motion out of the Vehicle Assembly Building was 1:05 a.m.  The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1704

KENNEDY SPACE CENTER, FLA. - Looking like fireflies gathered around t...

KENNEDY SPACE CENTER, FLA. - Looking like fireflies gathered around the behemoth mobile launcher platform and crawler-transporter, vehicles escort Space Shuttle Atlantis on its slow journey to Launch Pad 39B. ... More

KENNEDY SPACE CENTER, FLA. -  Space Shuttle Atlantis sits on the hardstand of Launch Pad 39B after its nearly 8-hour rollout from the Vehicle Assembly Building.  Extending from the fixed service structure on the left is the orbiter access arm, with the White Room on the outer end, adjacent to Atlantis.  Below the orbiter, on each side of the main engine nozzles, are the tail service masts that provide several umbilical connections to the orbiter, including a liquid-oxygen line through one and a liquid-hydrogen line through another.   Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder & George Shelton KSC-06pd1726

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis sits on the hards...

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis sits on the hardstand of Launch Pad 39B after its nearly 8-hour rollout from the Vehicle Assembly Building. Extending from the fixed service structure on th... More

KENNEDY SPACE CENTER, FLA. -    Space Shuttle Atlantis, atop the mobile launcher platform, sits on Launch Pad 39B after a nearly 8-hour crawl from the Vehicle Assembly Building.  At left is the open rotating service structure and fixed service structure with the 80-foot lightning mast on top.  Extended from the fixed structure is the orbiter access arm, with the White Room adjacent to Atlantis. At right is the 290-foot high, 300,000- gallon water tank that aids in sound suppression during launch. The water releases just prior to the ignition of the shuttle engines and flows through 7-foot-diameter pipes for about 20 seconds, pouring into 16 nozzles atop the flame deflectors and from outlets in the main engines exhaust hole in the mobile launcher platform.   Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder & George Shelton KSC-06pd1725

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis, atop the mobil...

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis, atop the mobile launcher platform, sits on Launch Pad 39B after a nearly 8-hour crawl from the Vehicle Assembly Building. At left is the open rotating se... More

KENNEDY SPACE CENTER, FLA. -   The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS)  still illuminate the orbiter on Launch Pad 39B. Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but  a 24-hour scrub was called by mission managers due to a concern with Fuel Cell 1.  Seen poised above the orange external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Extending from the FSS to Atlantis is the orbiter access arm with the White Room at the end.  The White Room provides entry into the orbiter through the hatch.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Troy Cryder KSC-06pd2053

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space S...

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS) still illuminate the orbiter on Launch Pad 39B. Atlantis was originally s... More

KENNEDY SPACE CENTER, FLA. -   The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS)  still illuminate the orbiter on Launch Pad 39B. Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but  a 24-hour scrub was called by mission managers due to a concern with Fuel Cell 1.  Seen poised above the orange external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Extending from the FSS to Atlantis is the orbiter access arm with the White Room at the end.  The White Room provides entry into the orbiter through the hatch.  At right is the 300,000-gallon water tank that releases its contents onto the mobile launcher platform during liftoff to aid sound suppression. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Troy Cryder KSC-06pd2051

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space S...

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS) still illuminate the orbiter on Launch Pad 39B. Atlantis was originally s... More

KENNEDY SPACE CENTER, FLA. -   The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS)  still illuminate the orbiter on Launch Pad 39B. Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but  a 24-hour scrub was called by mission managers due to a concern with Fuel Cell 1.  Seen poised above the orange external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Extending from the FSS to Atlantis is the orbiter access arm with the White Room at the end.  The White Room provides entry into the orbiter through the hatch.  At right is the 300,000-gallon water tank that releases its contents onto the mobile launcher platform during liftoff to aid sound suppression.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Troy Cryder KSC-06pd2052

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space S...

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS) still illuminate the orbiter on Launch Pad 39B. Atlantis was originally s... More

KENNEDY SPACE CENTER, FLA. -  Menacing storm clouds roll through the Launch Complex 39 Area at NASA's Kennedy Space Center.  Seen in the photo is the lower parking lot for the NASA News Center where the media's vehicles and satellite trucks are situated the day before (L-1) the second scheduled launch attempt for Space Shuttle Atlantis on mission STS-115.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Troy Cryder KSC-06pd2069

KENNEDY SPACE CENTER, FLA. - Menacing storm clouds roll through the L...

KENNEDY SPACE CENTER, FLA. - Menacing storm clouds roll through the Launch Complex 39 Area at NASA's Kennedy Space Center. Seen in the photo is the lower parking lot for the NASA News Center where the media's... More

KENNEDY SPACE CENTER, FLA. -  Menacing storm clouds roll  through the Launch Complex 39 Area at NASA's Kennedy Space Center.  Framed between the horizon and the clouds is Space Shuttle Atlantis on Launch Pad 39B.  The flag in the foreground is at the NASA News Center, near the countdown clock.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Troy Cryder KSC-06pd2070

KENNEDY SPACE CENTER, FLA. - Menacing storm clouds roll through the ...

KENNEDY SPACE CENTER, FLA. - Menacing storm clouds roll through the Launch Complex 39 Area at NASA's Kennedy Space Center. Framed between the horizon and the clouds is Space Shuttle Atlantis on Launch Pad 39... More

KENNEDY SPACE CENTER, FLA. -  Storm clouds fill the sky behind the Vehicle Assembly Building on the day before (L-1) the second scheduled launch attempt for Space Shuttle Atlantis on mission STS-115.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Troy Cryder KSC-06pd2068

KENNEDY SPACE CENTER, FLA. - Storm clouds fill the sky behind the Veh...

KENNEDY SPACE CENTER, FLA. - Storm clouds fill the sky behind the Vehicle Assembly Building on the day before (L-1) the second scheduled launch attempt for Space Shuttle Atlantis on mission STS-115. During th... More

KENNEDY SPACE CENTER, FLA. -  Menacing storm clouds roll through the Launch Complex 39 Area at NASA's Kennedy Space Center.  In the background is the Vehicle Assembly Building.  In the foreground is the lower parking lot for the NASA News Center where the media's vehicles and satellite trucks are situated the day before (L-1) the second scheduled launch attempt for Space Shuttle Atlantis on mission STS-115.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Troy Cryder KSC-06pd2071

KENNEDY SPACE CENTER, FLA. - Menacing storm clouds roll through the L...

KENNEDY SPACE CENTER, FLA. - Menacing storm clouds roll through the Launch Complex 39 Area at NASA's Kennedy Space Center. In the background is the Vehicle Assembly Building. In the foreground is the lower p... More

KENNEDY SPACE CENTER, FLA. --  Inside the Space Station Processing Facility, technicians secure the SPACEHAB Module to the overhead crane for transfer to the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station.  STS-116 will be mission number 20 to the station and construction flight 12A.1. Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7.  Photo credit: NASA/Troy Cryder KSC-06pd2445

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Fac...

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, technicians secure the SPACEHAB Module to the overhead crane for transfer to the Payload Canister. The SPACEHAB Module will carry rac... More

KENNEDY SPACE CENTER, FLA. --    Inside the Space Station Processing Facility, an overhead crane lowers the SPACEHAB Module into the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station.  STS-116 will be mission number 20 to the station and construction flight 12A.1. Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7.  Photo credit: NASA/Troy Cryder KSC-06pd2449

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing F...

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, an overhead crane lowers the SPACEHAB Module into the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight... More

KENNEDY SPACE CENTER, FLA. --    Inside the Space Station Processing Facility, an overhead crane carries the SPACEHAB Module towards the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station.  STS-116 will be mission number 20 to the station and construction flight 12A.1. Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7.  Photo credit: NASA/Troy Cryder KSC-06pd2448

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing F...

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, an overhead crane carries the SPACEHAB Module towards the Payload Canister. The SPACEHAB Module will carry racks of experiments, fl... More

KENNEDY SPACE CENTER, FLA. --   Inside the Space Station Processing Facility, an overhead crane carries the SPACEHAB Module towards the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station.  STS-116 will be mission number 20 to the station and construction flight 12A.1. Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7.  Photo credit: NASA/Troy Cryder KSC-06pd2447

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Fa...

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, an overhead crane carries the SPACEHAB Module towards the Payload Canister. The SPACEHAB Module will carry racks of experiments, fli... More

KENNEDY SPACE CENTER, FLA. --     Inside the Space Station Processing Facility, an overhead crane lowers the SPACEHAB Module into the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station.  STS-116 will be mission number 20 to the station and construction flight 12A.1. Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7.  Photo credit: NASA/Troy Cryder KSC-06pd2450

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing ...

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, an overhead crane lowers the SPACEHAB Module into the Payload Canister. The SPACEHAB Module will carry racks of experiments, fligh... More

KENNEDY SPACE CENTER, FLA. --  Inside the Space Station Processing Facility, an overhead crane lifts the SPACEHAB Module from its stand for transfer to the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station.  STS-116 will be mission number 20 to the station and construction flight 12A.1. Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7.  Photo credit: NASA/Troy Cryder KSC-06pd2446

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Fac...

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, an overhead crane lifts the SPACEHAB Module from its stand for transfer to the Payload Canister. The SPACEHAB Module will carry racks... More

KENNEDY SPACE CENTER, FLA. --  Inside the Space Station Processing Facility, technicians secure the protective coverings on the SPACEHAB Module before it is transferred to the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station. STS-116 will be mission number 20 to the station and construction flight 12A.1.  Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7.  Photo credit: NASA/Troy Cryder KSC-06pd2442

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Fac...

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, technicians secure the protective coverings on the SPACEHAB Module before it is transferred to the Payload Canister. The SPACEHAB Mod... More

KENNEDY SPACE CENTER, FLA. --  Inside the Space Station Processing Facility, technicians secure the protective coverings on the SPACEHAB Module before it is transferred to the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station. STS-116 will be mission number 20 to the station and construction flight 12A.1.  Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7.  Photo credit: NASA/Troy Cryder KSC-06pd2443

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Fac...

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, technicians secure the protective coverings on the SPACEHAB Module before it is transferred to the Payload Canister. The SPACEHAB Mod... More

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, workers are attaching an overhead crane to the Japanese Experiment Module (JEM) in order to  lift it.  The module is being moved to a stand where it will be weighed and measured for its center of gravity. The Japanese Aerospace Exploration Agency developed the laboratory at the Tsukuba Space Center near Tokyo. It is the first element, named "Kibo" (Hope), to be delivered to KSC. The JEM is Japan's primary contribution to the International Space Station. It will enhance the unique research capabilities of the orbiting complex by providing an additional environment for astronauts to conduct science experiments. The JEM is targeted for mission STS-124, to launch in early 2008.  Photo credit: NASA/Troy Cryder KSC-06pd2493

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, workers are attaching an overhead crane to the Japanese Experiment Module (JEM) in order to lift it. The module is being moved to a stan... More

KENNEDY SPACE CENTER, FLA. --  In the Space Station Processing Facility, the Japanese Experiment Module (JEM), after being weighed, makes a return trip to its transporter.  The Japanese Aerospace Exploration Agency developed the laboratory at the Tsukuba Space Center near Tokyo. It is the first element, named "Kibo" (Hope), to be delivered to KSC. The JEM is Japan's primary contribution to the International Space Station. It will enhance the unique research capabilities of the orbiting complex by providing an additional environment for astronauts to conduct science experiments. The JEM is targeted for mission STS-124, to launch in early 2008.  Photo credit: NASA/Troy Cryder KSC-06pd2502

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facilit...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, the Japanese Experiment Module (JEM), after being weighed, makes a return trip to its transporter. The Japanese Aerospace Exploration Ag... More

KENNEDY SPACE CENTER, FLA. --   In the Space Station Processing Facility, the Japanese Experiment Module (JEM), after being weighed, is lifted off the scale to be returned to its transporter. The Japanese Aerospace Exploration Agency developed the laboratory at the Tsukuba Space Center near Tokyo. It is the first element, named "Kibo" (Hope), to be delivered to KSC. The JEM is Japan's primary contribution to the International Space Station. It will enhance the unique research capabilities of the orbiting complex by providing an additional environment for astronauts to conduct science experiments. The JEM is targeted for mission STS-124, to launch in early 2008.  Photo credit: NASA/Troy Cryder KSC-06pd2501

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facili...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, the Japanese Experiment Module (JEM), after being weighed, is lifted off the scale to be returned to its transporter. The Japanese Aeros... More

KENNEDY SPACE CENTER, FLA. --   In the Space Station Processing Facility, workers observe as an overhead crane lowers the Japanese Experiment Module (JEM) onto a weighing stand.  The module will also be measured for its center of gravity. The Japanese Aerospace Exploration Agency developed the laboratory at the Tsukuba Space Center near Tokyo. It is the first element, named "Kibo" (Hope), to be delivered to KSC. The JEM is Japan's primary contribution to the International Space Station. It will enhance the unique research capabilities of the orbiting complex by providing an additional environment for astronauts to conduct science experiments. The JEM is targeted for mission STS-124, to launch in early 2008.  Photo credit: NASA/Troy Cryder KSC-06pd2499

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facili...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, workers observe as an overhead crane lowers the Japanese Experiment Module (JEM) onto a weighing stand. The module will also be measure... More

KENNEDY SPACE CENTER, FLA. --  In the Space Station Processing Facility, an overhead crane carries the Japanese Experiment Module (JEM) across the facility.  The module is being moved to another stand where it will be weighed and measured for its center of gravity. The Japanese Aerospace Exploration Agency developed the laboratory at the Tsukuba Space Center near Tokyo. It is the first element, named "Kibo" (Hope), to be delivered to KSC. The JEM is Japan's primary contribution to the International Space Station. It will enhance the unique research capabilities of the orbiting complex by providing an additional environment for astronauts to conduct science experiments. The JEM is targeted for mission STS-124, to launch in early 2008.  Photo credit: NASA/Troy Cryder KSC-06pd2496

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facilit...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, an overhead crane carries the Japanese Experiment Module (JEM) across the facility. The module is being moved to another stand where it ... More

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, workers monitor the placement of the Japanese Experiment Module (JEM) onto its transporter.  The JEM was moved from the transporter for weighing and to measure its center of gravity.  The Japanese Aerospace Exploration Agency developed the laboratory at the Tsukuba Space Center near Tokyo. It is the first element, named "Kibo" (Hope), to be delivered to KSC. The JEM is Japan's primary contribution to the International Space Station. It will enhance the unique research capabilities of the orbiting complex by providing an additional environment for astronauts to conduct science experiments. The JEM is targeted for mission STS-124, to launch in early 2008.  Photo credit: NASA/Troy Cryder KSC-06pd2504

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, workers monitor the placement of the Japanese Experiment Module (JEM) onto its transporter. The JEM was moved from the transporter for we... More

KENNEDY SPACE CENTER, FLA. --  In the Space Station Processing Facility, an overhead crane carries the Japanese Experiment Module (JEM) across the facility.  The module is being moved to another stand where it will be weighed and measured for its center of gravity.  Other modules intended for the International Space Station are visible on other stands.  The Japanese Aerospace Exploration Agency developed the laboratory at the Tsukuba Space Center near Tokyo. It is the first element, named "Kibo" (Hope), to be delivered to KSC. The JEM is Japan's primary contribution to the International Space Station. It will enhance the unique research capabilities of the orbiting complex by providing an additional environment for astronauts to conduct science experiments. The JEM is targeted for mission STS-124, to launch in early 2008.  Photo credit: NASA/Troy Cryder KSC-06pd2497

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facilit...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, an overhead crane carries the Japanese Experiment Module (JEM) across the facility. The module is being moved to another stand where it ... More

Previous

of 11

Next