KENNEDY SPACE CENTER, Fla. -- Workers watch the rollback of the Rotating Service Structure (left) from around Space Shuttle Discovery on Launch Pad 39B. Poised above the orange external tank is the Gaseous Oxygen Vent Arm with the “beanie cap,” a vent hood. The RSS provides protected access to the orbiter for changeout and servicing of payloads. It is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad’s flame trench. Space Shuttle Discovery is scheduled to launch March 8 at 6:42 a.m. EST on the eighth construction flight to the International Space Station. It carries the Multi-Purpose Logistics Module Leonardo, the primary delivery system used to resupply and return Station cargo requiring a pressurized environment. Leonardo will deliver up to 10 tons of laboratory racks filled with equipment, experiments and supplies for outfitting the newly installed U.S. Laboratory Destiny KSC01pp0441

Similar

KENNEDY SPACE CENTER, Fla. -- Workers watch the rollback of the Rotating Service Structure (left) from around Space Shuttle Discovery on Launch Pad 39B. Poised above the orange external tank is the Gaseous Oxygen Vent Arm with the “beanie cap,” a vent hood. The RSS provides protected access to the orbiter for changeout and servicing of payloads. It is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad’s flame trench. Space Shuttle Discovery is scheduled to launch March 8 at 6:42 a.m. EST on the eighth construction flight to the International Space Station. It carries the Multi-Purpose Logistics Module Leonardo, the primary delivery system used to resupply and return Station cargo requiring a pressurized environment. Leonardo will deliver up to 10 tons of laboratory racks filled with equipment, experiments and supplies for outfitting the newly installed U.S. Laboratory Destiny KSC01pp0441

description

Summary

KENNEDY SPACE CENTER, Fla. -- Workers watch the rollback of the Rotating Service Structure (left) from around Space Shuttle Discovery on Launch Pad 39B. Poised above the orange external tank is the Gaseous Oxygen Vent Arm with the “beanie cap,” a vent hood. The RSS provides protected access to the orbiter for changeout and servicing of payloads. It is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad’s flame trench. Space Shuttle Discovery is scheduled to launch March 8 at 6:42 a.m. EST on the eighth construction flight to the International Space Station. It carries the Multi-Purpose Logistics Module Leonardo, the primary delivery system used to resupply and return Station cargo requiring a pressurized environment. Leonardo will deliver up to 10 tons of laboratory racks filled with equipment, experiments and supplies for outfitting the newly installed U.S. Laboratory Destiny

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

date_range

Date

08/03/2001
create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

kennedy space center
kennedy space center