CAPE CANAVERAL, Fla. -- In the Space Shuttle Main Engine Processing Facility at NASA's Kennedy Space Center in Florida, one of six space shuttle main engines is prepared for the STS-134 and STS-335 missions. Postflight inspections and maintenance of each engine are conducted in the facility between shuttle missions by Pratt & Whitney Rocketdyne aerospace technicians. Three main engines are clustered at the aft end of the shuttle and have a combined thrust of more than 1.2 million pounds. Each engine utilizes liquid hydrogen for fuel and liquid oxygen as oxidizer and operates during the entire eight-and-a-half minute ride to orbit.    Space shuttle Endeavour's STS-134 mission is the final planned mission of the Space Shuttle Program and will deliver the Alpha Magnetic Spectrometer, as well as critical spare components, to the International Space Station next year. Shuttle Atlantis will be prepared for STS-335, which is the planned "launch on need," or potential rescue mission, for Endeavour's STS-134 mission. For information, visit www.nasa.gov/shuttle. Photo credit: NASA/Jack Pfaller KSC-2010-4671

Similar

CAPE CANAVERAL, Fla. -- In the Space Shuttle Main Engine Processing Facility at NASA's Kennedy Space Center in Florida, one of six space shuttle main engines is prepared for the STS-134 and STS-335 missions. Postflight inspections and maintenance of each engine are conducted in the facility between shuttle missions by Pratt & Whitney Rocketdyne aerospace technicians. Three main engines are clustered at the aft end of the shuttle and have a combined thrust of more than 1.2 million pounds. Each engine utilizes liquid hydrogen for fuel and liquid oxygen as oxidizer and operates during the entire eight-and-a-half minute ride to orbit. Space shuttle Endeavour's STS-134 mission is the final planned mission of the Space Shuttle Program and will deliver the Alpha Magnetic Spectrometer, as well as critical spare components, to the International Space Station next year. Shuttle Atlantis will be prepared for STS-335, which is the planned "launch on need," or potential rescue mission, for Endeavour's STS-134 mission. For information, visit www.nasa.gov/shuttle. Photo credit: NASA/Jack Pfaller KSC-2010-4671

description

Summary

CAPE CANAVERAL, Fla. -- In the Space Shuttle Main Engine Processing Facility at NASA's Kennedy Space Center in Florida, one of six space shuttle main engines is prepared for the STS-134 and STS-335 missions. Postflight inspections and maintenance of each engine are conducted in the facility between shuttle missions by Pratt & Whitney Rocketdyne aerospace technicians. Three main engines are clustered at the aft end of the shuttle and have a combined thrust of more than 1.2 million pounds. Each engine utilizes liquid hydrogen for fuel and liquid oxygen as oxidizer and operates during the entire eight-and-a-half minute ride to orbit. Space shuttle Endeavour's STS-134 mission is the final planned mission of the Space Shuttle Program and will deliver the Alpha Magnetic Spectrometer, as well as critical spare components, to the International Space Station next year. Shuttle Atlantis will be prepared for STS-335, which is the planned "launch on need," or potential rescue mission, for Endeavour's STS-134 mission. For information, visit www.nasa.gov/shuttle. Photo credit: NASA/Jack Pfaller

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

date_range

Date

17/09/2010
create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

kennedy space center
kennedy space center