KENNEDY SPACE CENTER, FLA. - - In the Vehicle Assembly Building, the solid rocket boosters (SRBs) are being stacked for the orbiter Discovery and mission STS-116. They are in high bay 3, situated on the mobile launcher platform, seen beneath the aft skirt. Discovery will be rolling over to the VAB in early November to be stacked with the SRBs and external tank for launch. ): STS-116 will be mission number 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. Launch is scheduled for no earlier than Dec. 7. Photo credit: NASA/Jack Pfaller KSC-06pd2258
Summary
KENNEDY SPACE CENTER, FLA. - - In the Vehicle Assembly Building, the solid rocket boosters (SRBs) are being stacked for the orbiter Discovery and mission STS-116. They are in high bay 3, situated on the mobile launcher platform, seen beneath the aft skirt. Discovery will be rolling over to the VAB in early November to be stacked with the SRBs and external tank for launch. ): STS-116 will be mission number 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. Launch is scheduled for no earlier than Dec. 7. Photo credit: NASA/Jack Pfaller
Tags
Date
05/10/2006
Location
Source
NASA
Copyright info
Public Domain Dedication (CC0)