KENNEDY SPACE CENTER, Fla. -- In the Vertical Processing Facility, part of the equipment to be used on mission STS-109 sits on a workstand after removal of the protective cover. The mission is to service the Hubble Space Telescope, replacing Solar Array 2 with Solar Array 3, replacing the Power Control Unit, removing the Faint Object Camera and installing the Advanced Camera for Surveys, installing the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and installing New Outer Blanket Layer insulation on bays 5 through 8.  Mission STS-109 is scheduled for launch Feb. 14, 2002 KSC-01pp1699

Similar

KENNEDY SPACE CENTER, Fla. -- In the Vertical Processing Facility, part of the equipment to be used on mission STS-109 sits on a workstand after removal of the protective cover. The mission is to service the Hubble Space Telescope, replacing Solar Array 2 with Solar Array 3, replacing the Power Control Unit, removing the Faint Object Camera and installing the Advanced Camera for Surveys, installing the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and installing New Outer Blanket Layer insulation on bays 5 through 8. Mission STS-109 is scheduled for launch Feb. 14, 2002 KSC-01pp1699

description

Summary

KENNEDY SPACE CENTER, Fla. -- In the Vertical Processing Facility, part of the equipment to be used on mission STS-109 sits on a workstand after removal of the protective cover. The mission is to service the Hubble Space Telescope, replacing Solar Array 2 with Solar Array 3, replacing the Power Control Unit, removing the Faint Object Camera and installing the Advanced Camera for Surveys, installing the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and installing New Outer Blanket Layer insulation on bays 5 through 8. Mission STS-109 is scheduled for launch Feb. 14, 2002

date_range

Date

09/11/2001
create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

kennedy space center
kennedy space center