The STS-92 crew exits the Operations and Checkout Building on their way to the Astrovan and Launch Pad 39A for a simulated countdown. Walking left to right are (foreground) Mission Specialists Koichi Wakata of Japan, Peter J.K. “Jeff” Wisoff and Leroy Chiao; and Pilot Pamela Ann Melroy. Behind them are Mission Specialists Michael E. Lopez-Alegria and William S. McArthur Jr.; and Commander Brian Duffy. The crew is taking part in Terminal Countdown Demonstration Test activities that provide emergency egress training, opportunities to inspect the mission payload, and the simulated countdown. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program KSC-00pp1360

Similar

The STS-92 crew exits the Operations and Checkout Building on their way to the Astrovan and Launch Pad 39A for a simulated countdown. Walking left to right are (foreground) Mission Specialists Koichi Wakata of Japan, Peter J.K. “Jeff” Wisoff and Leroy Chiao; and Pilot Pamela Ann Melroy. Behind them are Mission Specialists Michael E. Lopez-Alegria and William S. McArthur Jr.; and Commander Brian Duffy. The crew is taking part in Terminal Countdown Demonstration Test activities that provide emergency egress training, opportunities to inspect the mission payload, and the simulated countdown. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program KSC-00pp1360

description

Summary

The STS-92 crew exits the Operations and Checkout Building on their way to the Astrovan and Launch Pad 39A for a simulated countdown. Walking left to right are (foreground) Mission Specialists Koichi Wakata of Japan, Peter J.K. “Jeff” Wisoff and Leroy Chiao; and Pilot Pamela Ann Melroy. Behind them are Mission Specialists Michael E. Lopez-Alegria and William S. McArthur Jr.; and Commander Brian Duffy. The crew is taking part in Terminal Countdown Demonstration Test activities that provide emergency egress training, opportunities to inspect the mission payload, and the simulated countdown. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

date_range

Date

1960 - 1969
create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

kennedy space center
kennedy space center