The Motor Vessel Roberta Tabor locks through Lock and
Summary
The Motor Vessel Roberta Tabor locks through Lock and Dam 2 in Hastings, Minn., April 8. The tow was the first to break through the ice at Lake Pepin on the Mississippi River and arrive in St. Paul, Minn. Traditionally, the first tow to break through the ice marks the unofficial start to the navigation season for the Corps of Engineers, St. Paul District.
Tags
navigation
corps of engineers
hastings
st paul district
lock and dam 2
patrick moes
mn
first tow breaks through lake pepin heading toward st paul
dvids
ultra high resolution
high resolution
minnesota
us army corps of engineers
harbor
Date
08/04/2013
Source
Defense Visual Information Distribution Service
Link
Copyright info
Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright