kennedy space center, launch pad

14,098 media by topicpage 2 of 141
CAPE CANAVERAL, Fla. – Brilliant flames spread light across Launch Pad 39A at NASA's Kennedy Space Center in Florida as space shuttle Discovery roars toward space on the STS-128 mission. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo courtesy of Scott Andrews KSC-2009-4927

CAPE CANAVERAL, Fla. – Brilliant flames spread light across Launch Pad...

CAPE CANAVERAL, Fla. – Brilliant flames spread light across Launch Pad 39A at NASA's Kennedy Space Center in Florida as space shuttle Discovery roars toward space on the STS-128 mission. Liftoff from Launch Pad... More

CAPE CANAVERAL, Fla. - Workers move the Orbiter Transporter System (OTS) into Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida. The OTS will be moved under shuttle Atlantis for its rollover to the nearby Vehicle Assembly Building (VAB).            Once inside the VAB, Atlantis will be joined to its solid rocket boosters and external fuel tank on the mobile launcher platform. Later this month, Atlantis is scheduled to "rollout" to Launch Pad 39A on the STS-135 mission, which will deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. STS-135, targeted to launch June 28, will be the 33rd flight of Atlantis, the 37th shuttle mission to the station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. NASA/Jack Pfaller KSC-2011-3350

CAPE CANAVERAL, Fla. - Workers move the Orbiter Transporter System (OT...

CAPE CANAVERAL, Fla. - Workers move the Orbiter Transporter System (OTS) into Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida. The OTS will be moved under shuttle Atlantis for its rollov... More

CAPE CANAVERAL, Fla. – Ground support equipment technicians monitor the progress as one of the jacking, equalizing and leveling, or JEL, hydraulic cylinders is lifted from crawler-transporter 1 at the crawler transporter maintenance facility at NASA’s Kennedy Space Center in Florida. Sixteen new JEL hydraulic cylinders will be installed on CT-1 to increase load carrying capacity and reliability.    The Ground Systems Development and Operations Program at Kennedy continues to upgrade CT-1 as part of its general maintenance. CT-1 could be available to carry commercial launch vehicles to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years.  Photo credit: NASA/Tim Jacobs KSC-2013-3711

CAPE CANAVERAL, Fla. – Ground support equipment technicians monitor th...

CAPE CANAVERAL, Fla. – Ground support equipment technicians monitor the progress as one of the jacking, equalizing and leveling, or JEL, hydraulic cylinders is lifted from crawler-transporter 1 at the crawler t... More

CAPE CANAVERAL, Fla. -- At Launch Pad 39A at NASA's Kennedy Space Center in Florida, members of the STS-133 crew receive instruction by the catch nets for the slidewire baskets at the base of the pad as part of the Terminal Countdown Demonstration Test (TCDT) emergency exit training. From left are Mission Specialist Tim Kopra, Pilot Eric Boe, Commander Steve Lindsey, and Mission Specialists Alvin Drew, Nicole Stott and Michael Barratt.    TCDT provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and a launch countdown. Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5166

CAPE CANAVERAL, Fla. -- At Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. -- At Launch Pad 39A at NASA's Kennedy Space Center in Florida, members of the STS-133 crew receive instruction by the catch nets for the slidewire baskets at the base of the pad as part of... More

CAPE CANAVERAL, Fla. –  In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Mission Specialist Shane Kimbrough gets help with his suit before entering space shuttle Endeavour. He and other crew members will take part in a simulated launch countdown.  The crew is at Kennedy to take part in the Terminal Countdown Demonstration Test, which includes equipment familiarization, emergency exit training and the simulated countdown. On the STS-126 mission, space shuttle Endeavour's crew will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station’s Solar Alpha Rotary Joints. Endeavour is targeted to launch Nov. 14. Photo credit: NASA/Troy Cryder KSC-08pd3433

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's ...

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Mission Specialist Shane Kimbrough gets help with his suit before entering space shuttle Endeavour.... More

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure on Launch Pad 39B, Space Shuttle Endeavour is bathed in light.  Twin solid rocket boosters flank the orange external tank behind Endeavour.  Above the external tank is the Gaseous Oxygen Vent Arm that vents gaseous oxygen vapors away from the Shuttle.  The vent hood assembly at the end is often referred to as the "beanie cap."  Stretching to the crew hatch on the side of Endeavour is the Orbiter Access Arm with its environmentally controlled White Room at the end, through which the crew enters the vehicle.  The Shuttle sits on the Mobile Launcher Platform with the two service tail masts on either side of the main engines.  The tail masts support the fluid, gas and electrical requirements of the orbiter's liquid oxygen and liquid hydrogen aft T-0 umbilicals.  Each tail mast is 31 feet (9.4 meters) high, 15 feet (4.6 meters) long and 9 feet (3.1 meters) wide.   Endeavour is scheduled to launch on mission STS-108 Dec. 4 at 5:45  p.m. EST.  On this 12th flight to the International Space Station, known as a Utilization Flight, Endeavour will carry a crew of four plus the Expedition 4 crew, who will replace Expedition 3 aboard the ISS.  The payload includes the Multi-Purpose Logistics Module Raffaello, filled with supplies, equipment and experiments KSC01PD1763

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service S...

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure on Launch Pad 39B, Space Shuttle Endeavour is bathed in light. Twin solid rocket boosters flank the orange external tank behind En... More

CAPE CANAVERAL, Fla. -- During a simulated launch countdown on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-133 Mission Specialists Nicole Stott, left, and Michael Barratt are strapped into their seats on space shuttle Discovery. Next, they will practice escaping the shuttle, in preparation for an unlikely emergency at the pad on launch day. The simulated launch countdown and emergency exit training are part of a week-long Terminal Countdown Demonstration Test (TCDT).        Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5204

CAPE CANAVERAL, Fla. -- During a simulated launch countdown on Launch ...

CAPE CANAVERAL, Fla. -- During a simulated launch countdown on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-133 Mission Specialists Nicole Stott, left, and Michael Barratt are strapped into the... More

KENNEDY SPACE CENTER, FLA. --  The blue cones of light, known as shock or mach diamonds, beneath Space Shuttle Discovery's main engines confirm its rapid rise into the night sky after liftoff on mission STS-116. Mach diamonds are a formation of shock waves in the exhaust plume of an aerospace propulsion system. Liftoff occurred on time at 8:47 p.m. EST.  This was the second launch attempt for mission STS-116.  The first launch attempt on Dec. 7 was postponed due a low cloud ceiling over Kennedy Space Center. This is Discovery's 33rd mission and the first night launch since 2003.   The 20th shuttle mission to the International Space Station, STS-116 carries another truss segment, P5. It will serve as a spacer, mated to the P4 truss that was attached in September.  After installing the P5, the crew will reconfigure and redistribute the power generated by two pairs of U.S. solar arrays. Landing is expected Dec. 21 at KSC.   Photo credit: NASA/Tony Gray & Don Kight KSC-06pp2766

KENNEDY SPACE CENTER, FLA. -- The blue cones of light, known as shock...

KENNEDY SPACE CENTER, FLA. -- The blue cones of light, known as shock or mach diamonds, beneath Space Shuttle Discovery's main engines confirm its rapid rise into the night sky after liftoff on mission STS-116... More

KENNEDY SPACE CENTER, Fla. --  The early morning sun falls on Launch Pad 39A and Space Shuttle Discovery, which is waiting for launch on mission STS-92 Oct. 5, 2000. Leading to the pad (from the foreground) is the ramp leading from the crawlerway, the specially built road that provides the Shuttles access to the pads from the Vehicle Assembly Building. At the right of the pad is the 300,000-gallon water tank that is part of the sound suppression system during launches. Beyond is the Atlantic Ocean. At the far left can be seen Launch Pad 39B with its water tank KSC-00pp1298

KENNEDY SPACE CENTER, Fla. -- The early morning sun falls on Launch P...

KENNEDY SPACE CENTER, Fla. -- The early morning sun falls on Launch Pad 39A and Space Shuttle Discovery, which is waiting for launch on mission STS-92 Oct. 5, 2000. Leading to the pad (from the foreground) is ... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suitup and enter space shuttle Discovery for the 1:36 a.m. EDT liftoff. Seen here is Mission Specialist Nicole Stott, checking communications in her helmet. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4824

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile... More

KENNEDY SPACE CENTER, FLA. -   After its overnight rollout from the Vehicle Assembly Building, Space Shuttle Atlantis rests on the hard stand on Launch Pad 39B.   The shuttle sits on top of the mobile launcher platform.  The crawler, which transported it, is still underneath.  To the left is the rotating service structure, with the payload changeout room (PCR) open.  When the shuttle's payload is transported to the pad, it will be lifted into the PCR, the service structure will rotate to enclose the shuttle and the payload will be installed in Atlantis' payload bay.  The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1713

KENNEDY SPACE CENTER, FLA. - After its overnight rollout from the Ve...

KENNEDY SPACE CENTER, FLA. - After its overnight rollout from the Vehicle Assembly Building, Space Shuttle Atlantis rests on the hard stand on Launch Pad 39B. The shuttle sits on top of the mobile launcher ... More

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the closeout crew in the White Room help STS-127 crew members complete their suitup before entering space shuttle Endeavour for the 7:13 p.m. EDT liftoff.  Seen here is Mission Specialist Tom Marshburn.  This is the fourth launch attempt for the STS-127 mission. The first two launch attempts on June 13 and June 17 were scrubbed when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate. Mission managers also decided to delay tanking on July 11 for a launch attempt later in the day to allow engineers and safety personnel time to analyze data captured during lightning strikes near the pad on July 10. Endeavour will deliver the Japanese Experiment Module's Exposed Facility, or JEM-EF, and the Experiment Logistics Module-Exposed Section, or ELM-ES, in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.  STS-127 is the 29th flight for the assembly of the space.   Photo credit: NASA/Sandra Joseph & Kevin O'Connell KSC-2009-3980

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the closeout crew in the White Room help STS-127 crew members complete their suitup before entering space shuttle Endeavour fo... More

CAPE CANAVERAL, Fla. -  At Launch Pad 39A at NASA’s Kennedy Space Center in Florida, technicians work to move the Hubble payload canister into the payload changeout room for space shuttle Atlantis’ STS-125 mission.  The canister arrived at the pad on Saturday evening, however, early Sunday morning technicians were unable to place the canister into the pad’s payload changeout room. Teflon pads on “shoes” attached to the outside of the payload canister that help the canister move along guide rails didn’t fit properly. The shoes were removed and several options were considered, including slightly shaving down the pads so the shoes will fit onto the rails.  STS-125 is the fifth and final shuttle Hubble Space Telescope servicing mission. Atlantis’ launch is targeted for Oct. 10. Photo credit: NASA/Kim Shiflett. KSC-08pd2758

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA’s Kennedy Space Cent...

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA’s Kennedy Space Center in Florida, technicians work to move the Hubble payload canister into the payload changeout room for space shuttle Atlantis’ STS-125 miss... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Steve Swanson adjusts his helmet as he puts on the launch-and-entry suit for the launch of space shuttle Discovery.  The crew will be heading for Launch Pad 39A and liftoff of Discovery, scheduled for 7:43 p.m. EDT on March 15. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science.  Photo credit: NASA/Kim Shiflett KSC-2009-2044

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Steve Swanson adjusts his helmet as he puts on the launch-and-entry suit for ... More

CAPE CANAVERAL, Fla. -- During a simulated launch countdown the STS-135 crew pauses for a photo before climbing aboard the waiting Astrovan at NASA's Kennedy Space Center in Florida. As part of the Terminal Countdown Demonstration Test (TCDT), the crew members are driven to Kennedy's Launch Pad 39A and then strapped into space shuttle Atlantis to practice the steps that will be taken on launch day. From left are Mission Specialists Rex Walheim and Sandy Magnus, Pilot Doug Hurley and Commander Chris Ferguson.             Atlantis and its crew are targeted to lift off July 8, taking with them the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-4797

CAPE CANAVERAL, Fla. -- During a simulated launch countdown the STS-13...

CAPE CANAVERAL, Fla. -- During a simulated launch countdown the STS-135 crew pauses for a photo before climbing aboard the waiting Astrovan at NASA's Kennedy Space Center in Florida. As part of the Terminal Cou... More

KENNEDY SPACE CENTER, FLA. --  This closeup shows the internal connector to which the replacement feed-through connector in the engine cutoff, or ECO, sensor system on space shuttle Atlantis' external tank will be installed. The feed-through connector passes the wires from the inside of the tank to the outside.  Results of a tanking test on Dec. 18 pointed to an open circuit in the feed-through connector wiring, which is located at the base of the tank. The pins in the replacement connector have been precisely soldered to create a connection that allows sensors inside the tank to send signals to the computers onboard Atlantis. The work is being done on Launch Pad 39A.   Space shuttle Atlantis is now targeted for launch on Feb. 7.  Photo credit: NASA/George Shelton KSC-08pd0038

KENNEDY SPACE CENTER, FLA. -- This closeup shows the internal connect...

KENNEDY SPACE CENTER, FLA. -- This closeup shows the internal connector to which the replacement feed-through connector in the engine cutoff, or ECO, sensor system on space shuttle Atlantis' external tank will... More

CAPE CANAVERAL, Fla. - Twitter followers and media representatives at the NASA Press Site have front-row seats as space shuttle Atlantis launches through the clouds from Launch Pad 39A on a balmy Florida afternoon at NASA's Kennedy Space Center.    Liftoff on its STS-129 mission came at 2:28 p.m. EST Nov. 16.  Aboard are crew members Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On STS-129, the crew will deliver two ExPRESS Logistics Carriers to the International Space Station, the largest of the shuttle's cargo carriers, containing 15 spare pieces of equipment including two gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html.  Photo credit: NASA/Gianni Woods KSC-2009-6337

CAPE CANAVERAL, Fla. - Twitter followers and media representatives at ...

CAPE CANAVERAL, Fla. - Twitter followers and media representatives at the NASA Press Site have front-row seats as space shuttle Atlantis launches through the clouds from Launch Pad 39A on a balmy Florida aftern... More

KENNEDY SPACE CENTER, FLA. --  A long-range tracking camera captures images of space shuttle Atlantis as it launches on mission STS-122 from Launch Pad 39A at NASA's Kennedy Space Center.  Liftoff was on time at 2:45 p.m. EST.  Long-range cameras are used during early phases of ascent to identify and track debris and continue to be used as long as the vehicle is visible.  At the controls is Tim Terry, with Kennedy Space Center Integrated Communications Services. During the 11-day mission, the crew's prime objective is to attach the Columbus laboratory to the Harmony module, adding to the International Space Station's size and capabilities.   Photo credit: NASA/Kenny Allen KSC-08pd0240

KENNEDY SPACE CENTER, FLA. -- A long-range tracking camera captures i...

KENNEDY SPACE CENTER, FLA. -- A long-range tracking camera captures images of space shuttle Atlantis as it launches on mission STS-122 from Launch Pad 39A at NASA's Kennedy Space Center. Liftoff was on time a... More

CAPE CANAVERAL, Fla. –  In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Pilot Eric Boe waits to finish his suit-up. He and other crew members will take part in a simulated launch countdown after entering space shuttle Endeavour. The crew is at Kennedy to take part in the Terminal Countdown Demonstration Test, which includes equipment familiarization, emergency exit training and the simulated countdown.  On the STS-126 mission, space shuttle Endeavour's crew will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station’s Solar Alpha Rotary Joints. Endeavour is targeted to launch Nov. 14. Photo credit: NASA/Troy Cryder KSC-08pd3430

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's ...

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Pilot Eric Boe waits to finish his suit-up. He and other crew members will take part in a simulated... More

In the Spacecraft Assembly and Encapsulation Facility, the Tracking and Data Relay Satellite (TDRS-H) at right sits while one-half of the fairing (left) is moved closer to it. After encapsulation in the fairing, TDRS will be transported to Launch Pad 36A, Cape Canaveral Air Force Station for launch scheduled June 29 aboard an Atlas IIA/Centaur rocket. One of three satellites (labeled H, I and J) being built in the Hughes Space and Communications Company Integrated Satellite Factory in El Segundo, Calif., the latest TDRS uses an innovative springback antenna design. A pair of 15-foot-diameter, flexible mesh antenna reflectors fold up for launch, then spring back into their original cupped circular shape on orbit. The new satellites will augment the TDRS system’s existing Sand Ku-band frequencies by adding Ka-band capability. TDRS will serve as the sole means of continuous, high-data-rate communication with the space shuttle, with the International Space Station upon its completion, and with dozens of unmanned scientific satellites in low earth orbit KSC00pp0749

In the Spacecraft Assembly and Encapsulation Facility, the Tracking an...

In the Spacecraft Assembly and Encapsulation Facility, the Tracking and Data Relay Satellite (TDRS-H) at right sits while one-half of the fairing (left) is moved closer to it. After encapsulation in the fairing... More

The STS-98 crew, gathered at Launch Pad 39A one day before launch, wave and give a thumbs up. From left, they are Pilot Mark Polansky, Commander Ken Cockrell and Mission Specialists Marsha Ivins, Robert Curbeam and Thomas Jones. Behind them is Space Shuttle Atlantis, poised for launch.This mission marks the seventh Shuttle flight to the International Space Station and the first Shuttle mission of the year. On the mission, the crew will deliver the U.S. Laboratory Destiny to the growing Space Station. Destiny will be attached to the Unity node using the Shuttle’s robotic arm. Three spacewalks are required to complete the planned construction work. The 11-day STS-98 mission is scheduled to launch Feb. 7 at 6:11 p.m. EST, with a planned KSC landing about 1:39 p.m. on Feb. 18 KSC01padig051

The STS-98 crew, gathered at Launch Pad 39A one day before launch, wav...

The STS-98 crew, gathered at Launch Pad 39A one day before launch, wave and give a thumbs up. From left, they are Pilot Mark Polansky, Commander Ken Cockrell and Mission Specialists Marsha Ivins, Robert Curbeam... More

KENNEDY SPACE CENTER, Fla.  -- As the sun sinks in the west, Space Shuttle Endeavour on Launch Pad 39A is silhouetted. Only one solid rocket booster and external tank is visible with the Rotating Service Structure still in place. The 80-foot-tall fiberglass mast on top of the Fixed Service Structure points to the sky. Endeavour waits for mission STS-99, known as the Shuttle Radar Topography Mission (SRTM), which will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the SRTM could be close to 1 trillion measurements of the Earth's topography. The mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeavour KSC-00pp0218

KENNEDY SPACE CENTER, Fla. -- As the sun sinks in the west, Space Shu...

KENNEDY SPACE CENTER, Fla. -- As the sun sinks in the west, Space Shuttle Endeavour on Launch Pad 39A is silhouetted. Only one solid rocket booster and external tank is visible with the Rotating Service Struct... More

KENNEDY SPACE CENTER, FLA. -   Viewed from a camera in the midst of Florida greenery across the marshy water, Space Shuttle Discovery leaps through billows of smoke and steam on Launch Pad 39B on the historic Return to Flight mission STS-114.  Liftoff occurred at 10:39 a.m. EDT. This is the 114th Space Shuttle flight and the 31st for Discovery.  The 12-day mission is expected to end with touchdown at the Shuttle Landing Facility on Aug. 7.  On this mission to the International Space Station the crew will perform inspections on-orbit for the first time of all of the Reinforced Carbon-Carbon (RCC) panels on the leading edge of the wings and the Thermal Protection System tiles using the new Canadian-built Orbiter Boom Sensor System and the data from 176 impact and temperature sensors. Mission Specialists will also practice repair techniques on RCC and tile samples during a spacewalk in the payload bay.  During two additional spacewalks, the crew will install the External Stowage Platform-2, equipped with spare part assemblies, and a replacement Control Moment Gyroscope contained in the Lightweight Multi-Purpose Experiment Support Structure. KSC-05pp1779

KENNEDY SPACE CENTER, FLA. - Viewed from a camera in the midst of Fl...

KENNEDY SPACE CENTER, FLA. - Viewed from a camera in the midst of Florida greenery across the marshy water, Space Shuttle Discovery leaps through billows of smoke and steam on Launch Pad 39B on the historic R... More

CAPE CANAVERAL, Fla. –  On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure is open, revealing space shuttle Atlantis on the pad for the STS-125 mission, the fifth and final shuttle servicing mission for NASA’s Hubble Space Telescope.  On the RSS, the payload canister is in position at the payload changeout room to receive the Hubble hardware.  The payload comprises four carriers holding various equipment for the mission.  The hardware will be transported back to Kennedy’s Payload Hazardous Servicing Facility where it will be stored until a new target launch date can be set for Atlantis’ STS-125 mission in 2009.  Atlantis’ October target launch date was delayed after a device on board Hubble used in the storage and transmission of science data to Earth shut down on Sept. 27.  Replacing the broken device will be added to Atlantis’ servicing mission to the telescope. Photo credit: NASA/Tim Jacobs KSC-08pd3113

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure is open, revealing space shuttle Atlantis on the pad for the STS-125 mission, the fifth and fi... More

KENNEDY SPACE CENTER, FLA. -- At NASA's Kennedy Space Center, the payload canister atop its transporter rolls toward Launch Pad 39A. The canister contains the Columbus Lab module and integrated cargo carrier-lite payloads for space shuttle Atlantis on mission STS-122.  They will be transferred into the payload changeout room on the pad. Atlantis is targeted to launch on Dec. 6.  Photo credit: NASA/Dimitri Gerondidakis KSC-07pd3237

KENNEDY SPACE CENTER, FLA. -- At NASA's Kennedy Space Center, the payl...

KENNEDY SPACE CENTER, FLA. -- At NASA's Kennedy Space Center, the payload canister atop its transporter rolls toward Launch Pad 39A. The canister contains the Columbus Lab module and integrated cargo carrier-li... More

CAPE CANAVERAL, Fla. –  In NASA Kennedy Space Center's Firing Room 4, STS-128  Launch Director Pete Nickolenko waits for the launch of space shuttle Discovery on the STS-128 mission. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Kim Shiflett KSC-2009-4901

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Firing Room 4, ...

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Firing Room 4, STS-128 Launch Director Pete Nickolenko waits for the launch of space shuttle Discovery on the STS-128 mission. Liftoff from Launch Pad 39A... More

KENNEDY SPACE CENTER, FLA. --  Space Shuttle Atlantis is poised for flight at liftoff from Launch Pad 39A on mission STS-117 to the International Space Station.   Liftoff was on-time at 7:38:04 p.m. EDT.  The shuttle is delivering a new segment to the starboard side of the International Space Station's backbone, known as the truss. Three spacewalks are planned to install the S3/S4 truss segment, deploy a set of solar arrays and prepare them for operation. STS-117 is the 118th space shuttle flight, the 21st flight to the station, the 28th flight for Atlantis and the first of four flights planned for 2007.   Photo courtesy of Nikon/Scott Andrews KSC-07pd1445

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis is poised for fl...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis is poised for flight at liftoff from Launch Pad 39A on mission STS-117 to the International Space Station. Liftoff was on-time at 7:38:04 p.m. EDT. The s... More

KENNEDY SPACE CENTER, FLA. -- In the Payload Changeout Room (part of the Rotation Service Structure at the launch pad), the doors of the payload canister open to reveal its cargo, the SPACEHAB module (bottom) and Unpressurized Cargo Pallet (top).  The payload will be transferred from this environmentally controlled room into the payload bay of Shuttle Atlantis for mission STS-106.  The 11-day mission to the International Space Station will include service module support tasks on orbit, transfer supplies and outfit the Space Station for the first long-duration crew.  Atlantis is scheduled to launch Sept. 8 at 8:30 a.m. EDT. KSC-00pp1126

KENNEDY SPACE CENTER, FLA. -- In the Payload Changeout Room (part of t...

KENNEDY SPACE CENTER, FLA. -- In the Payload Changeout Room (part of the Rotation Service Structure at the launch pad), the doors of the payload canister open to reveal its cargo, the SPACEHAB module (bottom) a... More

KENNEDY SPACE CENTER, FLA. - The STS-107 crew share a humorous moment on Launch Pad 39A during Terminal Countdown Demonstration Test activities.  From left are Commander Rick Husband, Payload Specialist Ilan Ramon (the first Israeli astronaut), Pilot William "Willie" McCool, Mission Specialists Lauarel Clark and David Brown; in the foreground (back to camera) is Payload Commander Michael Anderson. The TCDT also includes a simulated launch countdown.  STS-107 is a mission devoted to research and will include more than 80 experiments that will study Earth and space science, advanced technology development, and astronaut health and safety. Launch is planned for Jan. 16, 2003, between 10 a.m. and 2 p.m. EST aboard Space Shuttle Columbia.    . KSC-02pd1975

KENNEDY SPACE CENTER, FLA. - The STS-107 crew share a humorous moment ...

KENNEDY SPACE CENTER, FLA. - The STS-107 crew share a humorous moment on Launch Pad 39A during Terminal Countdown Demonstration Test activities. From left are Commander Rick Husband, Payload Specialist Ilan Ra... More

CAPE CANAVERAL, Fla. -- Sunrise at NASA's Kennedy Space Center in Florida finds space shuttle Atlantis on Launch Pad 39A after the payload canister carrying the Raffaello multi-purpose logistics module (MPLM) was lifted into the payload changeout room on the rotating service structure.            Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandra Magnus and Rex Walheim are targeted to lift off on space shuttle Atlantis July 8, taking with them the MPLM packed with supplies, logistics and spare parts to the International Space Station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-4505

CAPE CANAVERAL, Fla. -- Sunrise at NASA's Kennedy Space Center in Flor...

CAPE CANAVERAL, Fla. -- Sunrise at NASA's Kennedy Space Center in Florida finds space shuttle Atlantis on Launch Pad 39A after the payload canister carrying the Raffaello multi-purpose logistics module (MPLM) w... More

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the tip-top of the bright-orange external fuel tank is where workers will prepare to begin removing the quick disconnect from the ground umbilical carrier plate (GUCP). A hydrogen gas leak at that location during tanking for space shuttle Discovery's STS-133 mission to the International Space Station caused the launch attempt to be scrubbed Nov. 5. The GUCP will be examined to determine the cause of the hydrogen leak and then repaired. The GUCP is the overboard vent to the pad and the flame stack where the vented hydrogen is burned off. Discovery's next launch attempt is targeted for no earlier than Nov. 30 at 4:02 a.m. EST.        For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Troy Cryder KSC-2010-5563

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the tip-top of the bright-orange external fuel tank is where workers will prepare to begin removing the quick disconnect from... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Atlantis, attached to its external tank and solid rocket boosters atop a mobile launcher platform, arrives at Launch Complex 39A. First motion on the 3.4-mile trip from the Vehicle Assembly Building, known as rollout, was at 6:38 a.m. EDT Oct. 14. The rollout took about six hours, and the shuttle was secure on the pad at 1:31 p.m.    Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for Nov. 12. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-5438

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, spac...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Atlantis, attached to its external tank and solid rocket boosters atop a mobile launcher platform, arrives at Launch Complex 39A. ... More

CAPE CANAVERAL, Fla. -- Swarms of people are at the Kennedy Space Center Visitor Complex in Florida to watch space shuttle Discovery lift off on its final scheduled mission from Launch Pad 39A.      Liftoff is set for 4:50 p.m. EST on Feb. 24. Discovery and its six-member STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Discovery, which will fly its 39th mission, is scheduled to be retired following STS-133. This will be the 133rd Space Shuttle Program mission and the 35th shuttle voyage to the space station. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Jack Pfaller KSC-2011-1624

CAPE CANAVERAL, Fla. -- Swarms of people are at the Kennedy Space Cent...

CAPE CANAVERAL, Fla. -- Swarms of people are at the Kennedy Space Center Visitor Complex in Florida to watch space shuttle Discovery lift off on its final scheduled mission from Launch Pad 39A. Liftoff is ... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS-133 Commander Steve Lindsey talks to media at Launch Pad 39A, where space shuttle Discovery is poised for launch next month. The six-member STS-133 crew is at Kennedy for the Terminal Countdown Demonstration Test (TCDT), which provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and emergency training at the launch pad.    Discovery and its crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5148

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS-133 Commander Steve Lindsey talks to media at Launch Pad 39A, where space shuttle Discovery is poised for launch next month. The six-member... More

KENNEDY SPACE CENTER, FLA. -   After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure.  The rollback was in preparation for launch July 1 on mission STS-121.  Extending toward the cockpit of the shuttle is the orbiter access arm with the White Room extended.  The White Room provides access into the orbiter for the astronauts.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge.  The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration.  This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1308

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service ...

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure. The rollback w... More

CAPE CANAVERAL, Fla. -  A waning full moon bears witness to space shuttle Endeavour’s rollout from the Vehicle Assembly Building at NASA’s Kennedy Space Center, traveling at less than 1 mph atop a massive crawler-transporter. Endeavour completed the 4.2-mile journey to Launch Pad 39B on Sept. 19 at 6:59 a.m. EDT. For the first time since July 2001, two shuttles are on the launch pads at the same time at the center. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to repair NASA's Hubble Space Telescope, targeted to launch Oct. 10. After Endeavour is cleared from its duty as a rescue spacecraft, it will be moved to Launch Pad 39A for the STS-126 mission to the International Space Station. That flight is targeted for launch Nov. 12. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd2659

CAPE CANAVERAL, Fla. - A waning full moon bears witness to space shut...

CAPE CANAVERAL, Fla. - A waning full moon bears witness to space shuttle Endeavour’s rollout from the Vehicle Assembly Building at NASA’s Kennedy Space Center, traveling at less than 1 mph atop a massive crawl... More

KENNEDY SPACE CENTER, FLA. --  In NASA's Vehicle Assembly Building, orbiter Discovery is in place on the mobile launcher platform after being lowered into high bay 3 for mating with its external tank and solid rocket boosters.  Space Shuttle Discovery is expected to roll out to Launch Pad 39B later this week via the crawler-transporter.  Launch of Discovery on mission STS-121 is scheduled to take place in a window extending July 1 to July 19. Photo credit: NASA/Jim Grossmann KSC-06pd0833

KENNEDY SPACE CENTER, FLA. -- In NASA's Vehicle Assembly Building, or...

KENNEDY SPACE CENTER, FLA. -- In NASA's Vehicle Assembly Building, orbiter Discovery is in place on the mobile launcher platform after being lowered into high bay 3 for mating with its external tank and solid ... More

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-134 Mission Specialist Greg Chamitoff, left, and Commander Mark Kelly take a break from training on the M113 armored personnel carrier at NASA's Kennedy Space Center in Florida. An M113 is kept at the foot of the launch pad in case an emergency exit from the pad is needed and every shuttle crew is trained on driving the vehicle before launch.        Endeavour's six crew members are at Kennedy for the launch countdown dress rehearsal called the Terminal Countdown Demonstration Test (TCDT) and related training. Targeted to launch April 19 at 7:48 p.m. EDT, they will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank, additional spare parts for the Dextre robotic helper and micrometeoroid debris shields to the space station. This will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-2552

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-134 Mission Specialist Greg Chamitoff, left, and Commander Mark Kelly take a break from training on the M113 armored personnel carrier at NA... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS-133 launch team members rehearse procedures for the liftoff of space shuttle Discovery's final mission in Firing Room 4. The team at Kennedy also participated in launch simulations with personnel at NASA's Johnson Space Center in Houston.    Discovery's next launch opportunity to the International Space Station on the STS-133 mission is planned for no earlier than Feb. 24. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2011-1049

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS-133 launch team members rehearse procedures for the liftoff of space shuttle Discovery's final mission in Firing Room 4. The team at Kenned... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, shuttle Discovery is ushered into the Vehicle Assembly Building (VAB) from Orbiter Processing Facility-3 during a move known as "rollover." Once inside the VAB, the shuttle will be joined to its solid rocket boosters and external fuel tank. Later this month, Discovery is scheduled to "rollout" to Launch Pad 39A for its launch to the International Space Station on the STS-133 mission.    Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the station. Photo credit: NASA/ Dimitri Gerondidakis KSC-2010-4605

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, shu...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, shuttle Discovery is ushered into the Vehicle Assembly Building (VAB) from Orbiter Processing Facility-3 during a move known as "rollover." Onc... More

KENNEDY SPACE CENTER, FLA. -- Emerging from the billows of smoke and steam on Launch Pad 39A, space shuttle Atlantis hurtles into space for a rendezvous with the International Space Station on mission STS-122.  Liftoff was on time at 2:45 p.m. EST. This is the third launch attempt for Atlantis since December 2007 to carry the European Space Agency's Columbus laboratory to the station.  During the 11-day mission, the crew's prime objective is to attach the laboratory to the Harmony module, adding to the station's size and capabilities.   Photo credit: Scott Andrews KSC-08pd0245

KENNEDY SPACE CENTER, FLA. -- Emerging from the billows of smoke and s...

KENNEDY SPACE CENTER, FLA. -- Emerging from the billows of smoke and steam on Launch Pad 39A, space shuttle Atlantis hurtles into space for a rendezvous with the International Space Station on mission STS-122. ... More

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour rests on Launch Pad 39A after rollout from the Vehicle Assembly Building.  The Shuttle comprises the orbiter, in front, and the taller orange external tank behind it flanked by twin solid rocket boosters. On either side of Endeavour's tail and main engines are the tail service masts that support the fluid,, gas and electrical requirements of the orbiter's liquid oxyen and liquid hydrogen aft T-0 umbilicals. Mission STS-111 is designated UF-2, the 14th assembly flight to the International Space Station.  Endeavour's payload includes the Multi-Purpose Logistics Module Leonardo and Mobile Base System.  The mission also will swap resident crews on the Station, carrying the Expedition 5 crew and returning to Earth Expedition 4.  Liftoff of Endeavour is scheduled between 4 and 8 p.m. May 30, 2002 KSC-02pd0591

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour rests on Launch ...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour rests on Launch Pad 39A after rollout from the Vehicle Assembly Building. The Shuttle comprises the orbiter, in front, and the taller orange external tank ... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a left-side main separation bolt attaches the bottom of space shuttle Discovery to its external fuel tank in the Vehicle Assembly Building. As technicians were attaching the bolt Sept. 10, a bolt nut slipped back into Discovery's aft compartment. To retrieve it, technicians entered Discovery’s aft section through an access door. They then moved the nut back into position to finish attaching the bolt, which is used to separate Discovery from the external tank once the shuttle is in orbit. Discovery is scheduled to roll out to Launch Pad 39A later this month for its STS-133 launch to the International Space Station.    Targeted to lift off Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the station. Photo credit: NASA/Dimitri Gerondidakis KSC-2010-4648

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a l...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a left-side main separation bolt attaches the bottom of space shuttle Discovery to its external fuel tank in the Vehicle Assembly Building. As ... More

KENNEDY SPACE CENTER, FLA. - As the orbiter Discovery, sitting on an orbiter transporter, moves away from NASA's Orbiter Processing Facility toward the Vehicle Assembly Building (VAB), workers accompany the vehicle.  The rollover to the VAB marks the start of the journey to the launch pad and, ultimately, launch.  Once inside the VAB, Discovery will be raised to vertical and lifted up and over into high bay 3 for stacking with its redesigned external tank and twin solid rocket boosters.  The rollout of Space Shuttle Discovery to Launch Pad 39B is expected in approximately a week.  Launch of Discovery on mission STS-121 is scheduled to take place in a window extending July 1 to July 19. Photo credit: NASA/Jim Grossmann KSC-06pd0818

KENNEDY SPACE CENTER, FLA. - As the orbiter Discovery, sitting on an o...

KENNEDY SPACE CENTER, FLA. - As the orbiter Discovery, sitting on an orbiter transporter, moves away from NASA's Orbiter Processing Facility toward the Vehicle Assembly Building (VAB), workers accompany the veh... More

An STS-102 crew member reaches for the release lever for the slidewire basket, used for emergency egress from the orbiter and pad. The crew is at KSC for Terminal Countdown Demonstration Test activities, which include the emergency training and a simulated launch countdown. On the horizon in the background can be seen the Vehicle Assembly Building. STS-102 is the eighth construction flight to the International Space Station, with Space Shuttle Discovery carrying the Multi-Purpose Logistics Module Leonardo. In addition, the Expedition Two crew will be on the mission, to replace Expedition One, who will return to Earth with Discovery. Launch on mission STS-102 is scheduled for March 8 KSC01pp0340

An STS-102 crew member reaches for the release lever for the slidewire...

An STS-102 crew member reaches for the release lever for the slidewire basket, used for emergency egress from the orbiter and pad. The crew is at KSC for Terminal Countdown Demonstration Test activities, which ... More

KENNEDY SPACE CENTER, FLA. -- The STS-98 crew poses for a group photo on the 215-foot level of the Fixed Service Structure at Launch Pad 39A. Dressed in their orange launch and entry suits are (left to right) Commander Ken Cockrell, Mission Specialist Marsha Ivins, Pilot Mark Polansky and Mission Specialists Robert Curbeam and Thomas Jones. Behind them can be seen the white nose cone of a solid rocket booster and the orange external tank on Space Shuttle Atlantis. The crew is taking part in emergency egress training and a simulated launch countdown as part of Terminal Countdown Demonstration Test activities. STS-98 is the seventh construction flight to the International Space Station, carrying as payload the U.S. Lab Destiny, a key element in the construction of the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m. EST KSC01pp0058

KENNEDY SPACE CENTER, FLA. -- The STS-98 crew poses for a group photo ...

KENNEDY SPACE CENTER, FLA. -- The STS-98 crew poses for a group photo on the 215-foot level of the Fixed Service Structure at Launch Pad 39A. Dressed in their orange launch and entry suits are (left to right) C... More

KENNEDY SPACE CENTER, Fla. -- Perched atop the Mobile Launcher Platform, Space Shuttle Endeavour passes through the gate to Launch Pad 39B. To the right of the pad is a 290-foot tall water tower. To the left is the Fixed Service Structure and Rotating Service Structure. Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections KSC-00padig057

KENNEDY SPACE CENTER, Fla. -- Perched atop the Mobile Launcher Platfor...

KENNEDY SPACE CENTER, Fla. -- Perched atop the Mobile Launcher Platform, Space Shuttle Endeavour passes through the gate to Launch Pad 39B. To the right of the pad is a 290-foot tall water tower. To the left is... More

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, members of space shuttle Endeavour's STS-130 crew put on their launch-and-entry suits before heading to the Astrovan for the ride to Launch Pad 39A. The crew is participating in a dress rehearsal for their upcoming launch, known as the Terminal Countdown Demonstration Test.  Making his second spaceflight on STS-130 is Mission Specialist Nicholas Patrick, seen here in his helmet.    The primary payload for the STS-130 mission is the International Space Station's Tranquility node, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top.  The cupola resembles a circular bay window and will provide a vastly improved view of the station's exterior. The multi-directional view will allow the crew to monitor spacewalks and docking operations, as well as provide a spectacular view of Earth and other celestial objects. The module was built in Turin, Italy, by Thales Alenia Space for the European Space Agency.  Launch of STS-130 is targeted for Feb. 7. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Kim Shiflett KSC-2010-1358

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, members of space shuttle Endeavour's STS-130 crew put on their launch-and-entry suits before heading to ... More

CAPE CANAVERAL, Fla. -- In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-135 Mission Specialist Rex Walheim checks the fit of his launch-and-entry suit before during a simulated launch countdown.          As part of the Terminal Countdown Demonstration Test (TCDT), the crew members are taken to Kennedy's Launch Pad 39A and strapped into space shuttle Atlantis to practice the steps that will be taken on launch day. Atlantis and its crew are targeted to lift off July 8, taking with them the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-4788

CAPE CANAVERAL, Fla. -- In the Operations and Checkout Building at NAS...

CAPE CANAVERAL, Fla. -- In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-135 Mission Specialist Rex Walheim checks the fit of his launch-and-entry suit before during a simu... More

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, workers wait to begin replace Shuttle Atlantis' Power Drive Unit (PDU), which is attached to the crane (center). The PDU controls the rudder/speed brake on the orbiter. Atlantis is scheduled to lift off April 24 at 4:15 p.m. EDT on mission STS-101, the third flight to the International Space Station. The primary mission is to carry logistics and supplies to the Space Station, plus the crew will be preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000 KSC-00pp0496

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, workers wait to begin...

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, workers wait to begin replace Shuttle Atlantis' Power Drive Unit (PDU), which is attached to the crane (center). The PDU controls the rudder/speed brake on the o... More

CAPE CANAVERAL, Fla. – STS-127 Mission Specialist Tim Kopra is happy to have successfully driven the M-113 armored personnel carrier, which is part of the training on emergency egress procedures. The crew members of space shuttle Endeavour's STS-127 mission are taking turns driving the M-113.  An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is at NASA's Kennedy Space Center for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes the emergency egress training and equipment familiarization.  The STS-127 mission is the final of three flights dedicated to the assembly of the Japanese Kibo laboratory complex.  Endeavour's launch is targeted for June 13.  Photo credit: NASA/Kim Shiflett KSC-2009-3379

CAPE CANAVERAL, Fla. – STS-127 Mission Specialist Tim Kopra is happy t...

CAPE CANAVERAL, Fla. – STS-127 Mission Specialist Tim Kopra is happy to have successfully driven the M-113 armored personnel carrier, which is part of the training on emergency egress procedures. The crew membe... More

CAPE CANAVERAL, Fla. -- At Launch Pad 39A at NASA's Kennedy Space Center in Florida, space shuttle Atlantis' STS-135 crew members take part in a payload bay walkdown to check out the cargo secured in Atlantis' bay. Seen here inspecting the airlock is Commander Chris Ferguson.        The astronauts are at Kennedy to participate in a launch countdown dress rehearsal called the Terminal Countdown Demonstration Test (TCDT) and related training. Atlantis and its crew are targeted to lift off July 8, taking with them the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-4736

CAPE CANAVERAL, Fla. -- At Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. -- At Launch Pad 39A at NASA's Kennedy Space Center in Florida, space shuttle Atlantis' STS-135 crew members take part in a payload bay walkdown to check out the cargo secured in Atlantis' ... More

CAPE CANAVERAL, Fla. -- Battalion Chief David Seymour provides supervision while space shuttle Atlantis' STS-135 crew members participate in M113 armored personnel carrier training at NASA's Kennedy Space Center in Florida. Driving the M113 is Pilot Doug Hurley; seated are  Mission Specialist Sandy Magnus (background right) and Commander Chris Ferguson.  An M113 is kept at the foot of the launch pad in case an emergency exit from the launch pad is needed and every shuttle crew is trained on driving the vehicle before launch. The STS-135 crew is at Kennedy to participate in a launch countdown dress rehearsal called the Terminal Countdown Demonstration Test (TCDT) and related training.       Atlantis and its crew are targeted to lift off July 8, taking with them the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html.  Photo credit: NASA/Kim Shiflett KSC-2011-4666

CAPE CANAVERAL, Fla. -- Battalion Chief David Seymour provides supervi...

CAPE CANAVERAL, Fla. -- Battalion Chief David Seymour provides supervision while space shuttle Atlantis' STS-135 crew members participate in M113 armored personnel carrier training at NASA's Kennedy Space Cente... More

KENNEDY SPACE CENTER, FLA. -- Sitting atop the Mobile Launcher Platform, Space Shuttle Atlantis inches its way to the launch pad.  The Shuttle and MLP rest on top of the crawler-transporter beneath it, which moves about 1 mile per hour. Atlantis is scheduled for launch April 4 on mission STS-110, which will install the S0 truss, the framework that eventually will hold the power and cooling systems needed for future international research laboratories on the International Space Station.  The  Canadarm2 robotic arm will be used exclusively to hoist the 13-ton truss from the payload bay to the Station.  The S0 truss will be the first major U.S. component launched to the Station since the addition of the Quest airlock in July 2001.  The four spacewalks planned for the construction will all originate from the airlock.  The mission will be Atlantis' 25th trip to space KSC-02pd0275

KENNEDY SPACE CENTER, FLA. -- Sitting atop the Mobile Launcher Platfor...

KENNEDY SPACE CENTER, FLA. -- Sitting atop the Mobile Launcher Platform, Space Shuttle Atlantis inches its way to the launch pad. The Shuttle and MLP rest on top of the crawler-transporter beneath it, which mo... More

KENNEDY SPACE CENTER, FLA. --  At NASA's Kennedy Space Center, the STS-120 crew don their launch and entry suits before heading to Launch Pad 39A for launch aboard space shuttle Discovery to the International Space Station.  Seen here is Pilot George Zamka, who is making his first shuttle flight.  Discovery is scheduled for liftoff at 11:38 a.m. EDT.  The mission will be the 23rd assembly flight to the space station and the 34th flight for Discovery.  Payload on the mission is the Italian-built U.S. Node 2, called Harmony.  During the 14-day mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them.  Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo credit: NASA/Kim Shiflett KSC-07pd2937

KENNEDY SPACE CENTER, FLA. -- At NASA's Kennedy Space Center, the STS...

KENNEDY SPACE CENTER, FLA. -- At NASA's Kennedy Space Center, the STS-120 crew don their launch and entry suits before heading to Launch Pad 39A for launch aboard space shuttle Discovery to the International S... More

KENNEDY SPACE CENTER, Fla. -- Perched atop the Mobile Launcher Platform, Space Shuttle Endeavour passes through the gate to Launch Pad 39B. To the right of the pad is a 290-foot tall water tower. To the left is the Fixed Service Structure and Rotating Service Structure. Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections KSC00padig057

KENNEDY SPACE CENTER, Fla. -- Perched atop the Mobile Launcher Platfor...

KENNEDY SPACE CENTER, Fla. -- Perched atop the Mobile Launcher Platform, Space Shuttle Endeavour passes through the gate to Launch Pad 39B. To the right of the pad is a 290-foot tall water tower. To the left is... More

KENNEDY SPACE CENTER, FLA. -- For the fourth time in Space Shuttle Program history, 350,000 gallons of water are released on a Mobile Launcher Platform (MLP) at Launch Pad 39A during a water sound suppression test. Because of the unusual event, media and workers watch from nearby vantage points on the Fixed Service Structure (left). This test is being conducted following the replacement of the six main system valves, which had been in place since the beginning of the Shuttle Program and had reached the end of their service life. Also, the hydraulic portion of the valve actuators has been redesigned and simplified to reduce maintenance costs. The sound suppression water system is installed on the launch pads to protect the orbiter and its payloads from damage by acoustical energy reflected from the MLP during launch. The system includes an elevated water tank with a capacity of 300,000 gallons. The tank is 290 feet high and stands on the northeast side of the Pad. The water is released for launch just before the ignition of the orbiter's three main engines and twin solid rocket boosters, and flows through parallel 7-foot-diameter pipes to the Pad area. KSC-04pd1066

KENNEDY SPACE CENTER, FLA. -- For the fourth time in Space Shuttle Pro...

KENNEDY SPACE CENTER, FLA. -- For the fourth time in Space Shuttle Program history, 350,000 gallons of water are released on a Mobile Launcher Platform (MLP) at Launch Pad 39A during a water sound suppression t... More

KENNEDY SPACE CENTER, Fla.  --  On the slidewire basket bunker area of Launch Pad 39A, STS-118 educator astronaut and Mission Specialist Barbara R. Morgan responds to a question from the media before the crew's morning training activities in the terminal countdown demonstration test, or TCDT.  Morgan joined NASA's Teacher in Space program in 1985 and was selected as an astronaut in 1998. TCDT activities include M-113 training, payload familiarization, the emergency egress training at the pad and a simulated launch countdown.  The mission is the 22nd flight to the International Space Station and Space Shuttle Endeavour will carry a payload including the S5 truss, a SPACEHAB module and external stowage platform 3. STS-118 is targeted for launch on Aug. 7.  NASA/George Shelton KSC-07pd1935

KENNEDY SPACE CENTER, Fla. -- On the slidewire basket bunker area of...

KENNEDY SPACE CENTER, Fla. -- On the slidewire basket bunker area of Launch Pad 39A, STS-118 educator astronaut and Mission Specialist Barbara R. Morgan responds to a question from the media before the crew's... More

KENNEDY SPACE CENTER, FLA. --  The space shuttle Atlantis STS-122 crew receives instruction on emergency exit from the fixed service structure on Launch Pad 39A. From left are Pilot Alan Poindexter and Mission Specialists Leopold Eyharts and Stanley Love.  Eyharts is with the European Space Agency and will remain on the International Space Station as a flight engineer for Expedition 16 following the STS-122 mission.   The STS-122 crew is at NASA's Kennedy Space Center to take part in terminal countdown demonstration test, or TCDT, activities, a standard part of launch preparations. The TCDT provides astronauts and ground crews with equipment familiarization and a simulated launch countdown before launch. On mission STS-122, Atlantis will deliver the European Space Agency's Columbus module to the International Space Station.  Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony, and will expand the research facilities aboard the station. Launch is targeted for Dec. 6.  Photo credit: NASA/Kim Shiflett KSC-07pd3384

KENNEDY SPACE CENTER, FLA. -- The space shuttle Atlantis STS-122 crew...

KENNEDY SPACE CENTER, FLA. -- The space shuttle Atlantis STS-122 crew receives instruction on emergency exit from the fixed service structure on Launch Pad 39A. From left are Pilot Alan Poindexter and Mission ... More

CAPE CANAVERAL, Fla. – In High Bay 1 in the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Endeavour hovers over the mobile launcher platform to which its external fuel tank and solid rocket boosters are secured.  Next, Endeavour will be attached to the tank to complete the shuttle stack.    Rollout of the stack to Kennedy’s Launch Pad 39A, a significant milestone in launch processing activities, is planned for early January 2010. The Italian-built Tranquility module, the primary payload for Endeavour's STS-130 mission, will be installed in the payload bay after the shuttle arrives at the pad.  Launch is targeted for early February. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Jack Pfaller KSC-2009-6777

CAPE CANAVERAL, Fla. – In High Bay 1 in the Vehicle Assembly Building ...

CAPE CANAVERAL, Fla. – In High Bay 1 in the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Endeavour hovers over the mobile launcher platform to which its external fuel tank ... More

KENNEDY SPACE CENTER, FLA. --  On Launch Pad 39A at NASA's Kennedy Space Center, the rotating service structure is rolling on its axis to uncover space shuttle Endeavour.  First motion was at 8:23 a.m. and rollback was complete at 8:55 a.m. The structure provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations.  The pad is cleared to the perimeter gate for operations to fill the external tank with about 500,000 gallons of cryogenic propellants used by the shuttle’s main engines. This is done at the pad approximately eight hours before the scheduled launch.  Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.  Launch is scheduled for 2:28 a.m. EDT March 11.  Photo credit: NASA/Kim Shiflett KSC-08pd0664

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A at NASA's Kennedy Spa...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A at NASA's Kennedy Space Center, the rotating service structure is rolling on its axis to uncover space shuttle Endeavour. First motion was at 8:23 a.m. and roll... More

CAPE CANAVERAL, Fla. -   On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-125 Mission Specialist Megan McArthur is ready to talk to the media about her role in the mission. The crew is at Kennedy to take part in terminal countdown demonstration test, or TCDT, activities before launching on space shuttle Atlantis’ mission to service NASA’s Hubble Space Telescope. TCDT provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization, emergency training and a simulated launch countdown. Atlantis is targeted to launch Oct. 10. Photo credit: NASA/Kim Shiflett KSC-08pd2849

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Cen...

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-125 Mission Specialist Megan McArthur is ready to talk to the media about her role in the mission. The crew is at Kenned... More

KENNEDY SPACE CENTER, FLA. -- Flags wave near Launch Pad 39A where space shuttle Endeavour waits for liftoff.  The rotating service structure was rolled back starting at 8:23 a.m. and complete at 8:55 a.m.  Above the orange external tank is seen the "beanie cap" at the end of the gaseous oxygen vent arm, extending from the fixed service structure. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle.  Below is the orbiter access arm with the White Room at the end, flush against the shuttle.  The crew gains access into the orbiter through the White Room.  The rotating structure provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations.  The pad is cleared to the perimeter gate for operations to fill the external tank with about 500,000 gallons of cryogenic propellants used by the shuttle’s main engines. This is done at the pad approximately eight hours before the scheduled launch.  Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.  Launch is scheduled for 2:28 a.m. EDT March 11.  Photo credit: NASA/Kim Shiflett KSC-08pd0673

KENNEDY SPACE CENTER, FLA. -- Flags wave near Launch Pad 39A where spa...

KENNEDY SPACE CENTER, FLA. -- Flags wave near Launch Pad 39A where space shuttle Endeavour waits for liftoff. The rotating service structure was rolled back starting at 8:23 a.m. and complete at 8:55 a.m. Abo... More

KENNEDY SPACE CENTER, FLA. -- Workers in the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2) make final adjustments on the nose fairing surrounding the Tracking and Data Relay Satellite-I (TDRS-I). The second in a new series of telemetry satellites, TDRS-I replenishes the existing on-orbit fleet of six spacecraft. The TDRS System is the primary source of space-to-ground voice, data and telemetry for the Space Shuttle. It also provides communications with the International Space Station and scientific spacecraft in low-Earth orbit such as the Hubble Space Telescope. This new advanced series of satellites will extend the availability of TDRS communications services until about 2017. Launch of TDRS-I is scheduled for March 8 aboard a Lockheed Martin Atlas IIA rocket from Pad 36-A, Cape Canaveral Air Force Station KSC-02pd0174

KENNEDY SPACE CENTER, FLA. -- Workers in the Spacecraft Assembly and E...

KENNEDY SPACE CENTER, FLA. -- Workers in the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2) make final adjustments on the nose fairing surrounding the Tracking and Data Relay Satellite-I (TDRS-I). Th... More

CAPE CANAVERAL, Fla. - In the Payload Changeout Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, members of the STS-129 crew, dressed in clean-room attire known as "bunny suits," pause a moment during their payload familiarization training for a photo. From left are Mission Specialists Robert L. Satcher Jr. and Leland Melvin.    The training affords the crew an opportunity to observe the placement of the Express Logistics Carriers 1 and 2 in space shuttle Atlantis' payload bay before launch.  The six astronauts for space shuttle Atlantis’ STS-129 mission came to Kennedy to participate in their launch dress rehearsal, the Terminal Countdown Demonstration Test.  Additional training associated with the test was done last month, but the simulated countdown was postponed because of a scheduling conflict with the launch of NASA’s Ares I-X test rocket.  Launch of Atlantis on its STS-129 mission to the International Space Station is set for Nov. 16.  On STS-129, the crew will deliver to the station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  For information on the STS-129 crew and mission objectives, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-6105

CAPE CANAVERAL, Fla. - In the Payload Changeout Room on Launch Pad 39A...

CAPE CANAVERAL, Fla. - In the Payload Changeout Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, members of the STS-129 crew, dressed in clean-room attire known as "bunny suits," pause a moment... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, technicians in the payload changeout room have maneuvered space shuttle Atlantis' cargo, the Raffaello multi-purpose logistics module (MPLM) into the shuttle's payload bay using the payload ground-handling mechanism at Launch Pad 39A. The rotating service structure that protects the shuttle from the elements and provides access has been moved back into place.              STS-135 Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandy Magnus and Rex Walheim are targeted to lift off on Atlantis July 8, taking with them the MPLM packed with supplies, logistics and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-4598

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, tec...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, technicians in the payload changeout room have maneuvered space shuttle Atlantis' cargo, the Raffaello multi-purpose logistics module (MPLM) in... More

KENNEDY SPACE CENTER, FLA. --   On Launch Pad 39A at NASA's Kennedy Space Center, STS-123 Mission Specialist Mike Foreman is helped with the final flight suit fit check in the White Room before entering space shuttle Endeavour for launch. The White Room provides access into the shuttle.  Liftoff was on time at 2:28 a.m. EDT.  The crew will make a record-breaking 16-day mission to the International Space Station and deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.  Photo credit: NASA/Scott Haun, Richard Prickett KSC-08pd0722

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A at NASA's Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A at NASA's Kennedy Space Center, STS-123 Mission Specialist Mike Foreman is helped with the final flight suit fit check in the White Room before entering space s... More

CAPE CANAVERAL, Fla. – NASA's Ares I-X test rocket ignites its first stage at Launch Pad 39B at NASA's Kennedy Space Center in Florida at 11:30 a.m. EDT on Oct. 28. The Constellation Program's 327-foot-tall rocket produces 2.96 million pounds of thrust at liftoff and reaches a speed of 100 mph in eight seconds. This was the first launch from Kennedy's pads of a vehicle other than the space shuttle since the Apollo Program's Saturn rockets were retired. The parts used to make the Ares I-X booster flew on 30 different shuttle missions ranging from STS-29 in 1989 to STS-106 in 2000. The data returned from more than 700 sensors throughout the rocket will be used to refine the design of future launch vehicles and bring NASA one step closer to reaching its exploration goals. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. Photo credit: NASA/ George Roberts and Tony Gray KSC-2009-5968

CAPE CANAVERAL, Fla. – NASA's Ares I-X test rocket ignites its first s...

CAPE CANAVERAL, Fla. – NASA's Ares I-X test rocket ignites its first stage at Launch Pad 39B at NASA's Kennedy Space Center in Florida at 11:30 a.m. EDT on Oct. 28. The Constellation Program's 327-foot-tall roc... More

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, members of space shuttle Endeavour's STS-130 crew put on their launch-and-entry suits before heading to the Astrovan for the ride to Launch Pad 39A. The crew is participating in a dress rehearsal for their upcoming launch, known as the Terminal Countdown Demonstration Test.  Making his first spaceflight on STS-130 is Pilot Terry Virts, seen here in his helmet.    The primary payload for the STS-130 mission is the International Space Station's Tranquility node, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top.  The cupola resembles a circular bay window and will provide a vastly improved view of the station's exterior. The multi-directional view will allow the crew to monitor spacewalks and docking operations, as well as provide a spectacular view of Earth and other celestial objects. The module was built in Turin, Italy, by Thales Alenia Space for the European Space Agency.  Launch of STS-130 is targeted for Feb. 7. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Kim Shiflett KSC-2010-1363

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, members of space shuttle Endeavour's STS-130 crew put on their launch-and-entry suits before heading to ... More

CAPE CANAVERAL, Fla. – Against a backdrop of clouds and framed below by banks of trees and bushes, space shuttle Atlantis roars off Launch Pad 39A at NASA's Kennedy Space Center in Florida for a rendezvous with NASA's Hubble Space Telescope on the STS-125 mission. Liftoff was on time at 2:01 p.m. EDT.  Atlantis' 11-day flight will include five spacewalks to refurbish and upgrade the telescope with state-of-the-art science instruments that will expand Hubble's capabilities and extend its operational lifespan through at least 2014.  The payload includes a Wide Field Camera 3, fine guidance sensor and the Cosmic Origins Spectrograph.  Photo credit: NASA/Sandra Joseph-Kevin O'Connell KSC-2009-3076

CAPE CANAVERAL, Fla. – Against a backdrop of clouds and framed below b...

CAPE CANAVERAL, Fla. – Against a backdrop of clouds and framed below by banks of trees and bushes, space shuttle Atlantis roars off Launch Pad 39A at NASA's Kennedy Space Center in Florida for a rendezvous with... More

CAPE CANAVERAL, Fla. -- Viewed from the Launch Pad 39A flame trench, crawler-transporter No. 2 moves under a space shuttle era mobile launcher platform at NASA's Kennedy Space Center in Florida. The activity was part of testing to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad.      NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each weighing six and a half million pounds and larger in size than a professional baseball infield, the crawler-transporters are powered by locomotive and large electrical power generator engines. The crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/ Jim Grossmann KSC-2012-6273

CAPE CANAVERAL, Fla. -- Viewed from the Launch Pad 39A flame trench, c...

CAPE CANAVERAL, Fla. -- Viewed from the Launch Pad 39A flame trench, crawler-transporter No. 2 moves under a space shuttle era mobile launcher platform at NASA's Kennedy Space Center in Florida. The activity wa... More

KENNEDY SPACE CENTER, FLA. -    The SRB Retrieval Ship Liberty Star begins the rest of its journey to Cape Canaveral Air Force Station with a spent solid rocket booster alongside.  The booster is from Space Shuttle Discovery, which launched on July 4.  The space shuttle’s solid rocket booster casings and associated flight hardware are recovered at sea.  The boosters impact the Atlantic Ocean approximately seven minutes after liftoff. The splashdown area is a square of about 6 by 9 nautical miles located about 140 nautical miles downrange from the launch pad. The retrieval ships are stationed approximately 8 to 10 nautical miles from the impact area at the time of splashdown. As soon as the boosters enter the water, the ships accelerate to a speed of 15 knots and quickly close on the boosters.  The pilot chutes and main parachutes are the first items to be brought on board. With the chutes and frustum recovered, attention turns to the boosters. The ship’s tow line is connected and the booster is returned to the Port and ,after transfer to a position alongside the ship, to Hangar AF at Cape Canaveral Air Force Station.  There, the expended boosters are disassembled, refurbished and reloaded with solid propellant for reuse.  Photo credit: NASA/George Shelton KSC-06pd1495

KENNEDY SPACE CENTER, FLA. - The SRB Retrieval Ship Liberty Star be...

KENNEDY SPACE CENTER, FLA. - The SRB Retrieval Ship Liberty Star begins the rest of its journey to Cape Canaveral Air Force Station with a spent solid rocket booster alongside. The booster is from Space Shu... More

CAPE CANAVERAL, Fla. – On the fixed service structure on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-125 crew members review emergency exit procedures.  Seen here are Mission Specialists Michael Good and Megan McArthur. Not clearly visible in the background is Mission Specialist Andrew Feustel.  Space shuttle Atlantis' 11-day flight is targeted for launch May 12 and will include five spacewalks to refurbish and upgrade the telescope with state-of-the-art science instruments. As a result, Hubble's capabilities will be expanded and its operational lifespan extended through at least 2014.  Photo credit: NASA/Cory Huston KSC-2009-2530

CAPE CANAVERAL, Fla. – On the fixed service structure on Launch Pad 39...

CAPE CANAVERAL, Fla. – On the fixed service structure on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-125 crew members review emergency exit procedures. Seen here are Mission Specialists Micha... More

KENNEDY SPACE CENTER, FLA. -   After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure.  The rollback was in preparation for launch July 1 on mission STS-121.  Extending toward the cockpit of the shuttle is the orbiter access arm with the White Room extended.  The White Room provides access into the orbiter for the astronauts.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge.  The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration.  This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1307

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service ...

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure. The rollback w... More

KENNEDY SPACE CENTER, FLA. --  Moments after liftoff, the launch of space shuttle Atlantis casts a glow in the lagoon waters during launch from Launch Pad 39A at NASA's Kennedy Space Center.  Atlantis is racing to the International Space Station on mission STS-122.  Liftoff was on time at 2:45 p.m. EST.  The launch is the third attempt for Atlantis since December 2007 to carry the European Space Agency's Columbus laboratory to the International Space Station.  During the 11-day mission, the crew's prime objective is to attach the laboratory to the Harmony module, adding to the station's size and capabilities.    Photo credit: NASA/Sandra Joseph, Tony Gray, Robert Murray KSC-08pd0216

KENNEDY SPACE CENTER, FLA. -- Moments after liftoff, the launch of sp...

KENNEDY SPACE CENTER, FLA. -- Moments after liftoff, the launch of space shuttle Atlantis casts a glow in the lagoon waters during launch from Launch Pad 39A at NASA's Kennedy Space Center. Atlantis is racing... More

CAPE CANAVERAL, Fla. -- Space shuttle Discovery's external fuel tank is being prepared for computed radiography scans inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The shuttle stack, consisting of the shuttle, external tank and solid rocket boosters, was moved off Launch Pad 39A so technicians could examine 21-foot-long support beams, called stringers, on the outside of the tank's intertank and re-apply foam insulation.          Discovery's next launch opportunity to the International Space Station on the STS-133 mission is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Frankie Martin KSC-2010-5956

CAPE CANAVERAL, Fla. -- Space shuttle Discovery's external fuel tank i...

CAPE CANAVERAL, Fla. -- Space shuttle Discovery's external fuel tank is being prepared for computed radiography scans inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The shuttle ... More

CAPE CANAVERAL, Fla. -- The first of four new emergency egress vehicles, called Mine-Resistant Ambush-Protection, or MRAP, vehicles arrived at Kennedy Space Center in Florida from the U.S. Army Red River Depot in Texarkana, Texas. Each vehicle will be processed in and then transported to the Rotation, Processing and Surge Facility near the Vehicle Assembly Building for temporary storage.    The Ground Systems Development and Operations Program at Kennedy led the efforts to an emergency egress vehicle that future astronauts could quickly use to leave the Launch Complex 39 area in case of an emergency. During crewed launches of NASA’s Space Launch System and Orion spacecraft, the MRAP will be stationed by the slidewire termination area at the pad. In case of an emergency, the crew will ride a slidewire to the ground and immediately board the MRAP for safe egress from the pad. The new vehicles replace the M-113 vehicles that were used during the Space Shuttle Program. Photo credit: NASA/Jim Grossmann KSC-2013-4300

CAPE CANAVERAL, Fla. -- The first of four new emergency egress vehicle...

CAPE CANAVERAL, Fla. -- The first of four new emergency egress vehicles, called Mine-Resistant Ambush-Protection, or MRAP, vehicles arrived at Kennedy Space Center in Florida from the U.S. Army Red River Depot ... More

KENNEDY SPACE CENTER, FLA. -- In the White Room at Launch Pad 39B, STS-112  Mission Specialist Sandra Magnus, Ph.D., receives assistance with her spacesuit during a simulated launch countdown, part of Terminal Countdown Demonstration Test activities, a dress rehearsal for launch.  Launch of STS-112 aboard Space Shuttle Atlantis is scheduled for Oct. 2, between 2 and 6 p.m. EDT.  STS-112 is the 15th assembly mission to the International Space Station.  Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment, which will be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A.  The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts. KSC-02pd1352

KENNEDY SPACE CENTER, FLA. -- In the White Room at Launch Pad 39B, STS...

KENNEDY SPACE CENTER, FLA. -- In the White Room at Launch Pad 39B, STS-112 Mission Specialist Sandra Magnus, Ph.D., receives assistance with her spacesuit during a simulated launch countdown, part of Terminal ... More

KENNEDY SPACE CENTER, FLA. -- Cameras are prepared to record the launch of Space Shuttle Atlantis from Launch Pad 39A following sunrise on a cloudy Florida day. Rollback of the pad's rotating service structure, or RSS, is one of the milestones in preparation for the launch of mission STS-117 on June 8. Rollback started at 10:56 p.m. EDT June 7 and was complete at 11:34 p.m. The RSS, the massive structure to the left of the shuttle, provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge. The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration. This mission is the 118th shuttle flight and the 21st U.S. flight to the International Space Station and will deliver and install the S3/S4 truss segment, deploy a set of solar arrays and prepare them for operation. Photo credit: NASA/Ken Thornsley KSC-07pd1399

KENNEDY SPACE CENTER, FLA. -- Cameras are prepared to record the launc...

KENNEDY SPACE CENTER, FLA. -- Cameras are prepared to record the launch of Space Shuttle Atlantis from Launch Pad 39A following sunrise on a cloudy Florida day. Rollback of the pad's rotating service structure,... More

CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 3 inside the Launch Control Center at NASA's Kennedy Space Center was one of the four control rooms used by NASA and contractor launch teams to oversee a space shuttle countdown. This firing room is furnished in the classic style with the same metal computer cabinets and some of the same monitors in place when the first shuttle mission launched April 12, 1981. Specialized operators worked at consoles tailored to keep track of the status of shuttle systems while the spacecraft was processed in the Orbiter Processing Facility, being stacked inside the Vehicle Assembly Building and standing at the launch pad before liftoff. The firing rooms, including 3, were also used during NASA's Apollo Program. Google precisely mapped the space center and some of its historical facilities for the company's map page. The work allows Internet users to see inside buildings at Kennedy as they were used during the space shuttle era. Photo credit: Google/Wendy Wang KSC-2013-3234

CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 3 inside th...

CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 3 inside the Launch Control Center at NASA's Kennedy Space Center was one of the four control rooms used by NASA and contractor launch teams to oversee... More

KENNEDY SPACE CENTER, FLA. - After sunset, Space Shuttle Atlantis is bathed in light from the fixed service structure on Launch Pad 39B. Seen on either side of Atlantis' engine nozzles are the tail masts, which provide several umbilical connections to the orbiter, including a liquid-oxygen line through one and a liquid-hydrogen line through another.  The shuttle had been moved off the launch pad due to concerns about the impact of Tropical Storm Ernesto, expected within 24 hours.  The forecast of lesser winds expected from Ernesto and its projected direction convinced Launch Integration Manager LeRoy Cain and Shuttle Launch Director Mike Leinbach to return the shuttle to the launch pad.   Photo credit: NASA/Kim Shiflett KSC-06pd2008

KENNEDY SPACE CENTER, FLA. - After sunset, Space Shuttle Atlantis is b...

KENNEDY SPACE CENTER, FLA. - After sunset, Space Shuttle Atlantis is bathed in light from the fixed service structure on Launch Pad 39B. Seen on either side of Atlantis' engine nozzles are the tail masts, which... More

CAPE CANAVERAL, Fla. -- Workers monitor space shuttle Discovery as it arrives at Launch Pad 39A from the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. It took the shuttle, attached to its external fuel tank, twin solid rocket boosters and mobile launcher platform, about seven hours to complete the move atop a crawler-transporter. This is the second time Discovery has rolled out to the pad for the STS-133 mission, and comes after a thorough check and modifications to the shuttle's external tank.             Targeted to liftoff Feb. 24, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the International Space Station. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2011-1282

CAPE CANAVERAL, Fla. -- Workers monitor space shuttle Discovery as it ...

CAPE CANAVERAL, Fla. -- Workers monitor space shuttle Discovery as it arrives at Launch Pad 39A from the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. It took the shuttle, attached to its... More

CAPE CANAVERAL, Fla. -- Crawler-transporter 1 continues its trek along the crawlerway to Launch Pad 39A at NASA’s Kennedy Space Center in Florida. New jacking, equalizing and leveling, or JEL, hydraulic cylinders were installed on CT-1 and are being tested for increased load carrying capacity and reliability.     The Ground Systems Development and Operations Program at Kennedy continues to upgrade the crawler-transporter as part of its general maintenance. CT-1 could be available to carry a variety of launch vehicles to the launch pad. Two crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Daniel Casper KSC-2013-4206

CAPE CANAVERAL, Fla. -- Crawler-transporter 1 continues its trek along...

CAPE CANAVERAL, Fla. -- Crawler-transporter 1 continues its trek along the crawlerway to Launch Pad 39A at NASA’s Kennedy Space Center in Florida. New jacking, equalizing and leveling, or JEL, hydraulic cylinde... More

CAPE CANAVERAL, Fla. -- STS-135 Mission Specialist Rex Walheim speaks to media during a question-and-answer session at NASA Kennedy Space Center's Launch Pad 39A in Florida. Space shuttle Atlantis' astronauts are at Kennedy to participate in a launch countdown dress rehearsal called the Terminal Countdown Demonstration Test (TCDT) and related training.            Atlantis and its crew are targeted to lift off July 8, taking with them the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-4710

CAPE CANAVERAL, Fla. -- STS-135 Mission Specialist Rex Walheim speaks ...

CAPE CANAVERAL, Fla. -- STS-135 Mission Specialist Rex Walheim speaks to media during a question-and-answer session at NASA Kennedy Space Center's Launch Pad 39A in Florida. Space shuttle Atlantis' astronauts a... More

In the Space Station Processing Facility, workers help guide the Multi-Purpose Logistics Module Donatello as it moves the length of the SSPF toward a workstand. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004 KSC-01pp0247

In the Space Station Processing Facility, workers help guide the Multi...

In the Space Station Processing Facility, workers help guide the Multi-Purpose Logistics Module Donatello as it moves the length of the SSPF toward a workstand. In the SSPF, Donatello will undergo processing by... More

CAPE CANAVERAL, Fla. -- Crew members in a skiff from Freedom Star, one of NASA's solid rocket booster retrieval ships, will usher a spent shuttle booster through the shallow waters of the locks at Port Canaveral, Fla. The booster, which was used during space shuttle Discovery's STS-133 launch from NASA Kennedy Space Center's Launch Pad 39A on Feb. 24, is on its way to Hangar AF at Cape Canaveral Air Force Station. The shuttle’s two solid rocket booster casings and associated flight hardware are recovered in the Atlantic Ocean after every launch by Freedom Star and Liberty Star. The boosters impact the Atlantic about seven minutes after liftoff and the retrieval ships are stationed about 10 miles from the impact area at the time of splashdown.  After the spent segments are processed, they will be transported to Utah, where they will be refurbished and stored, if needed. Photo credit: NASA/Ben Smegelsky KSC-2011-1934

CAPE CANAVERAL, Fla. -- Crew members in a skiff from Freedom Star, one...

CAPE CANAVERAL, Fla. -- Crew members in a skiff from Freedom Star, one of NASA's solid rocket booster retrieval ships, will usher a spent shuttle booster through the shallow waters of the locks at Port Canavera... More

STS-106 Mission Specialist Edward T. Lu grins upon his arrival at the KSC Shuttle Landing Facility. He and the rest of the crew will be making pre-launch preparations for the fourth flight to the International Space Station. STS-106 is scheduled to launch Sept. 8, 2000, at 8:45 a.m. EDT from Launch Pad 39B. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed "Expedition One," is due to arrive at the Station in late fall KSC-00pp1234

STS-106 Mission Specialist Edward T. Lu grins upon his arrival at the ...

STS-106 Mission Specialist Edward T. Lu grins upon his arrival at the KSC Shuttle Landing Facility. He and the rest of the crew will be making pre-launch preparations for the fourth flight to the International ... More

Cape Canaveral, Fla. -- Space shuttle Atlantis made its historic final journey to Launch Pad 39A after its 3.4 mile trek from NASA Kennedy Space Center's Vehicle Assembly Building. Atlantis was secured or "hard down," at its seaside launch pad at 3:29 a.m. EDT on Wednesday, June 1.          The milestone move, known as "rollout," paves the way for the launch of the STS-135 mission to the International Space Station, targeted for July 8. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit: www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Terry Zaperach KSC-2011-4220

Cape Canaveral, Fla. -- Space shuttle Atlantis made its historic final...

Cape Canaveral, Fla. -- Space shuttle Atlantis made its historic final journey to Launch Pad 39A after its 3.4 mile trek from NASA Kennedy Space Center's Vehicle Assembly Building. Atlantis was secured or "hard... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-3 at NASA's Kennedy Space Center in Florida, workers discuss moving, or "rolling over," shuttle Discovery to the nearby Vehicle Assembly Building (VAB). Once inside the VAB, the shuttle will be joined to its solid rocket boosters and external fuel tank. Later this month, Discovery is scheduled to "rollout" to Launch Pad 39A for its launch to the International Space Station on the STS-133 mission.    Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the station. Photo credit: NASA/Jack Pfaller KSC-2010-4583

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-3 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-3 at NASA's Kennedy Space Center in Florida, workers discuss moving, or "rolling over," shuttle Discovery to the nearby Vehicle Assembly Building (VAB). On... More

CAPE CANAVERAL, Fla. - Like a phoenix rising from the flames, space shuttle Atlantis emerges from the exhaust cloud building on Launch Pad 39A at NASA's Kennedy Space Center in Florida.    Liftoff on its STS-129 mission came at 2:28 p.m. EST Nov. 16.  Aboard are crew members Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On STS-129, the crew will deliver two ExPRESS Logistics Carriers to the International Space Station, the largest of the shuttle's cargo carriers, containing 15 spare pieces of equipment including two gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html.    Photo credit: NASA/Tom Farrar and Tony Gray KSC-2009-6361

CAPE CANAVERAL, Fla. - Like a phoenix rising from the flames, space sh...

CAPE CANAVERAL, Fla. - Like a phoenix rising from the flames, space shuttle Atlantis emerges from the exhaust cloud building on Launch Pad 39A at NASA's Kennedy Space Center in Florida. Liftoff on its STS-12... More

CAPE CANAVERAL, Fla. - As the sun sets behind Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure has been moved away from space shuttle Atlantis during the T-11 hour hold in the launch countdown.  Liftoff of the STS-129 mission is set for 2:28 p.m. EST Nov. 16.  The movable structure, which provides weather protection and access for technicians to work on the shuttle, began being retracted at 5:20 p.m. EST and was in the park position by 5:56 p.m.    STS-129 crew members are Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On the STS-129 mission to the International Space Station, the crew will deliver two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Troy Cryder KSC-2009-6300

CAPE CANAVERAL, Fla. - As the sun sets behind Launch Pad 39A at NASA's...

CAPE CANAVERAL, Fla. - As the sun sets behind Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure has been moved away from space shuttle Atlantis during the T-11 hour hold i... More

CAPE CANAVERAL, Fla. -- This is a version of space shuttle Atlantis' orbiter tribute, or OV-104, which hangs in Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida. In the lower-left corner, it features Atlantis soaring above Earth and threaded through the design are the mission patches for each of Atlantis’ flights. Atlantis' accomplishments include seven missions to the Russian space station Mir and several assembly, construction and resupply missions to the International Space Station. Atlantis also flew the last Hubble Space Telescope servicing mission on STS-125. In the tribute, the planet Venus represents the Magellan probe being deployed during STS-30, and Jupiter represents the Galileo probe being deployed during STS-34. The inset photos illustrate various aspects of shuttle processing as well as significant achievements, such as the glass cockpit and the first shuttle docking with Mir during STS-71. The inset photo in the upper-left corner shows a rainbow over Atlantis on Launch Pad 39A and shuttle Endeavour on Launch Pad 39B at Kennedy. Endeavour was the assigned vehicle had Atlantis’ STS-125 mission needed rescue, and this was the last time both launch pads were occupied at the same time. The stars in the background represent the many people who have worked with Atlantis and their contributions to the vehicle’s success. Graphic design credit: NASA/Amy Lombardo. NASA publication number: SP-2010-08-161-KSC KSC-2010-4450A

CAPE CANAVERAL, Fla. -- This is a version of space shuttle Atlantis' o...

CAPE CANAVERAL, Fla. -- This is a version of space shuttle Atlantis' orbiter tribute, or OV-104, which hangs in Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida. In the lower... More

KENNEDY SPACE CENTER, FLA. --  In the Space Station Processing Facility, the P5 truss for mission STS-116 is lowered into the payload canister.  The canister will transport the truss to Launch Pad 39B where it will wait for installation in Space Shuttle Discovery’s payload bay. The third port truss segment, the P5 will be attached to the P3/P4 truss on the International Space Station during the 11-day mission. The window for launch of mission STS-116 opens Dec. 7.   Photo credit: NASA/George Shelton KSC-06pd2409

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facilit...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, the P5 truss for mission STS-116 is lowered into the payload canister. The canister will transport the truss to Launch Pad 39B where it ... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Atlantis' main engines and solid rocket boosters ignite on Launch Pad 39A producing billows of smoke and steam as it lifts off on its STS-135 mission to the International Space Station.        Atlantis with its crew of four; Commander Chris Ferguson, Pilot Doug Hurley, Mission Specialists Sandy Magnus and Rex Walheim, lifted off at 11:29 a.m. EDT on July 8, 2011 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Tony Gray and Tom Farrar KSC-2011-5411

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Atlantis' main engines and solid rocket boosters ignite on Launch Pad 39A producing billows of smoke and steam as it lifts off on... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist John Phillips  is eager for launch as he puts on his launch-and-entry suit.  The crew will be heading for Launch Pad 39A and liftoff of space shuttle Discovery, scheduled for 7:43 p.m. EDT on March 15.  An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science.  Photo credit: NASA/Kim Shiflett KSC-2009-2033

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist John Phillips is eager for launch as he puts on his launch-and-entry suit. ... More

KENNEDY SPACE CENTER, FLA. --  Space Shuttle Endeavour races into the sky trailing columns of fire from the solid rocket boosters as it begins mission STS-118. The liftoff from Launch Pad 39A was on time at 6:36 p.m. EDT.  The mission is the 22nd shuttle flight to the International Space Station. It will continue space station construction by delivering a third starboard truss segment, S5, and other payloads such as the SPACEHAB module and the external stowage platform 3.  The 11-day mission may be extended to as many as 14 depending on the test of the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab.  Photo credit: NASA/Jerry Cannon, Mike Kerley KSC-07pd2271

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour races into the ...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour races into the sky trailing columns of fire from the solid rocket boosters as it begins mission STS-118. The liftoff from Launch Pad 39A was on time at 6:3... More

CAPE CANAVERAL, Fla. -- A Shuttle Training Aircraft (STA) is ready for flight on the Shuttle Landing Facility runway at NASA's Kennedy Space Center in Florida. STS-133 Commander Steve Lindsey and Pilot Eric Boe will fly the modified Gulfstream II business jets to mimic the shuttle's handling during the final phase of landing. Practice landings are part of the Terminal Countdown Demonstration Test (TCDT), which provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and emergency training at the launch pad.    Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Jack Pfaller KSC-2010-5093

CAPE CANAVERAL, Fla. -- A Shuttle Training Aircraft (STA) is ready for...

CAPE CANAVERAL, Fla. -- A Shuttle Training Aircraft (STA) is ready for flight on the Shuttle Landing Facility runway at NASA's Kennedy Space Center in Florida. STS-133 Commander Steve Lindsey and Pilot Eric Boe... More

KENNEDY SPACE CENTER, FLA. -- Workers monitor the progress of Space Shuttle Atlantis as it moves through the doors of the Vehicle Assembly Building along the crawlerway toward Launch Pad 39A. First motion out of the VAB was at 4:43 a.m. EST.  Rollout is a milestone for Atlantis' launch to the International Space Station on mission STS-122, targeted for Dec. 6. On this mission, Atlantis will deliver the Columbus module to the International Space Station. The European Space Agency's largest contribution to the station, Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony. The module is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The laboratory will expand the research facilities aboard the station, providing crew members and scientists from around the world the ability to conduct a variety of experiments in the physical, materials and life sciences.   Photo credit: NASA/Kim Shiflett KSC-07pd3259

KENNEDY SPACE CENTER, FLA. -- Workers monitor the progress of Space Sh...

KENNEDY SPACE CENTER, FLA. -- Workers monitor the progress of Space Shuttle Atlantis as it moves through the doors of the Vehicle Assembly Building along the crawlerway toward Launch Pad 39A. First motion out o... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Endeavour passes the fork in the crawlerway between Launch Pad 39B, at right, and Launch Pad 39A.  First motion of the 3.4-mile rollaround was at 3:16 a.m. EDT.  Endeavour was on standby on Pad 39B to be used in the unlikely event that a rescue mission was necessary during space shuttle Atlantis' STS-125 mission to NASA's Hubble Space Telescope. The payload on the STS-127 mission includes the Japan Aerospace Exploration Agency's Kibo Exposed Facility and the Experiment Logistics Module Exposed Section of the International Space Station. They will be installed on the Kibo laboratory already on the station. Launch of STS-127 is targeted for June 13. Photo credit: NASA/Kim Shiflett KSC-2009-3330

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, spac...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Endeavour passes the fork in the crawlerway between Launch Pad 39B, at right, and Launch Pad 39A. First motion of the 3.4-mile ro... More

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, secured atop a mobile launch platform, ascends the five percent grade to the top of the hardstand on Launch Pad 39A. The rotating service structure, adjoined to the fixed service structure at left, has been rolled back in preparation for the shuttle's arrival. First motion out of the Vehicle Assembly Building was at 4:43 a.m. EST, and the shuttle was hard down on the pad at 11:51 a.m.  Rollout is a milestone for Atlantis' launch to the International Space Station on mission STS-122, targeted for Dec. 6. On this mission, Atlantis will deliver the Columbus module to the International Space Station. The European Space Agency's largest contribution to the station, Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony. The module is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The laboratory will expand the research facilities aboard the station, providing crew members and scientists from around the world the ability to conduct a variety of experiments in the physical, materials and life sciences.   Photo credit: NASA/Kim Shiflett KSC-07pd3269

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, secured atop a m...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, secured atop a mobile launch platform, ascends the five percent grade to the top of the hardstand on Launch Pad 39A. The rotating service structure, adjoine... More

Previous

of 141

Next